<br /> <br />MINING PLAN <br />' The property that is the sub,~ect of this permit application consists of 37.1 <br />acres in total with 4.3 acres being unaffected by the mining operation. <br />The area that will be affected by the mining operation consists of 32.8 acres <br />with 28.5 acres being involved in excavation, and 4.3 acres being affected but <br />not mined. <br />An area situated in the north-east corner of the property, that is 4.3 acres in <br />size, will not be affected by the operation. <br />As is depicted on the premining map, there is a house and an out-building located <br />on the property. The house is a portable modular unit which will be removed from <br />the property and be relocated elsewhere. The out-building will be dismantled and <br />' removed from the property.The road that is shown from the state highway to the <br />house will be obliterated. <br />' Activities that will be conducted at this site will include extraction, crushing, <br />stockpiling and screening of gravel using surface mining techniques typical to <br />open pit gravel mining operations, production of hot mixed asphalt, and ready <br />mixed concrete. <br />The crusher plant will be a portable plant, which will be located at the site <br />intermittently as need dictates. Likewise, a portable asphalt plant and portable <br />t concrete plant will situated at the site as required by the prevailing market. <br />The development of this site will occur as a continuous process beginning in the <br />' north-west section and proceeding to the east and then southward. <br />The sequence of development will begin with the removal of topsoil from the <br />northern half of the mined area and storing it in berms along the western <br />' property boundary. Excess soil that cannot be contained in the west berm will <br />be stored in the southern portion of the property. Topsoil stockpiles will be <br />marked to identify them. Topsoil will be removed from the entire northern half <br />' of the mined area in order to protect the integrity of the soil from inadvertent <br />contamination by petroleum, chemicals and other potential pollutants. <br />' Once the topsoil is removed, gravel extraction will begin in the extreme north- <br />west corner of the mined area. The initial crushing operation will be conducted <br />at the top of the gravel deposit. After the first crushing run and the portable <br />crusher is moved out, subsequent crusher operations will be set up on the pit <br />' floor below the ground level. Gravel extraction and processing will proceed from <br />the north-west to the north-east. <br />' Gravel stockpiles will initially be situated on top of the deposit in the north- <br />east section of the mined area. <br />' 3 <br /> <br />