<br />5. Since the before and after use of the land is range land, minimal change will resuh to the <br />hydrologic balance. No off-site damage will occur. The slopes and other general configuration of <br />the land will be more stable due to the elimination of existing erosion in the slopes which are now <br />steeper then 3:1. <br />Backslopes will be a minimum of 3:1, and topsoil covered. The resulting land which will retain <br />vegetation better than slopes which currently exist. Seeding those new slopes between the upper <br />and lower disturbed area will be with a designated mixture specified by the Lincoln County Natural <br />Resoarce Conservation District. <br />6. Sand processing will be accomplished on the permit site. Screening and washing operation will <br />require 8 acres. <br />7. Sand will excavated from an open face by a front end loader or dozer and transported by a <br />conveyor to a screening pant and sand screw for washing and sizing. Processed material will be <br />stockpiled with a stacking conveyor. <br />8. Two settling ponds will be constructed. The ponds will be 150 feet by 150 feet. <br />9. Haul roads will be placed as shown on Exhibit E. <br />l0. No other structures will be placed on the permit area <br />l l . It is anticipated 94% of the material extracted will be removed from the property. The permit <br />area is actually larger then needed, but the extra property in the permit is to insure adequate mining <br />area in case the deposit is not as pure as anticipated, and to allow filling of the mining azea at <br />completion. <br />12. The mined azea will be filled with material from a ridge area included within the permit area on <br />the south side. <br />F. AREA OF SIGNIFICANT DISTURBANCE ' ,oo <br />`- . D <br />1. Actual mined area, 10 acres ~ ~ po <br />2. Finished product stockpile area, 2 acres i a ~ <br />3. Haul road inside and outside the main permit area, 2.7 acres a ~ ~ <br />4. Topsoil stockpile area, 1 acre ~' <br />5. Ridge sloping 5 Acres 1 j~ C <br />ry~ <br />G. ROAD DIMENSIONS <br />The haul road area is approximately 30 feet in width and 4,000 feet in length. The road will <br />use approximately 2.75acres. <br />H. WATER USAGE <br />The only water to be used in the mining operation is water obtained from on-site. <br />4 <br /> <br />