Laserfiche WebLink
Monday, December 04, 2000 11:49:19 <br />LOUIiONEN BROS. STONE <br />III IIIIIIIIIIIII III ~ <br />12/02/00 <br />Ms. Erica Crosby <br />Div. Minerals Rc Geology <br />1313 Sherntan St. Rnt. 2] 5 <br />Denver. Co. R0203 <br />RE: Response to letter of 12/01/00. Filz No. Ivi-2000-090 <br />1. Topsoils will be separated and stored in the southern comers of both permit sites. <br />2. It is our intention to limit thz zffzcts on the gully as much as possible, to say that thz <br />gulch will not be affected is incorrect. As slated in the przceding letter we may need to <br />usz thz gulch for access attd thzre will be materials that tall into the gulch during the <br />quam~utg process, but we will attempt to keep this to a minimum. <br />3. Agrzed <br />4. As noted in my last resprnrse that we would placz rip-rap in t-te channel if needed, but <br />the existing materials are adzquatz at this time. If othzr materials are needed we will file <br />an antendntznt to the perntit. <br />Page 1 of 1 <br />Sinczrzh'. <br />Alichael Loukouzn <br />