Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />Agency or organization name : CDMG <br />Task # : 051 State :Colorado <br />Date :06/14/2006 County : La Plata <br />User : TAK Site :King li Mine <br />Permit or oiher job action : Pr-8 <br />Task description :Mobilize <br />3 times for long-term maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2005) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $25.36 $28.12 $34,53 <br /> OperatingcosUhour: $36.15 $37.62 $41,10 <br /> OperatorcosUhour: $2740 $2740 $27.40 <br /> Helper cost hour : $D.DO $25.15 $25.15 <br /> Total Unit Cost/hour : $88.91 $118.29 $128.18 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhdunit Fleet Size <br />(No. units) Haut Trip <br />Costfhdfleet Return Trip <br />CosUhdfleet DOT permit <br />CosUOeet <br />-Cat D3G LGP - 3P 10.33 $11.05 $88.91 3 $299.88 $266.73 $0.00 <br />-CAT 12H 14.41 $17.82 $88.91 3 $320.20 $266.73 $0.00 <br />PermifCob # : C-81-035 <br />Abbreviation :none <br />Filename : C035-051 <br />sheet 1 of 2 <br />Subtotals :~ $620.08 ~ $533.46 ~ $0.00 <br />