Laserfiche WebLink
Cost Esthnafinst Software <br />BtiLLOOZER WQRK <br />• ~ \a.. ~, t -}•i ~~yt~rSe.~~-~xL2~ n~2uT!5ei`i jf .~ C a! <' QS n,i ~: <br />PROJECT tDENT1FICATION <br />Agency a agartiza6on name : COMG <br />Permit ar other job action : PR-8 <br />Task description :Remove ditches <br />HOURLY EQUIPMENT CST <br />Cost Breakdown <br />• Initial <br />volume <br />UDD-2, UD0.3, and UDD-4 <br />Basic machine : Cat D8R Series tt - 8SU <br />Blade type :Semi-Universa~ <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Ownership costfiour <br />Operating cosUhour <br />Ripper op.cosVhour <br />Operator cosUhour <br />Total unit cosUhour <br />1, 955 BCY <br />Task # : 601 State :Colorado Pernutfjob# : C-81-035 <br />Date : 06/042006 County : La Plata Abbeviation :none <br />User : TAK Site :King Coal Mine Filename : C035-601 <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Utilization 96 <br />$53.92 NA <br />$75.29 100 <br />$0.00 0 <br />$32.53 NA <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$161.74 Total tteet oostRaur <br /> <br />$167.74 <br />Swell Loose <br />factor : 1.250 volume : 2,444 LCY <br />Source of estimated volume : 6600 ft total length of ditches X 8 sq ft cross-sec. area <br />Source of estimated swell factor : DMG estimate <br />NOURLY~PRODl1CTK)N ~ Job Condifion Cortedion Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gratlienf : 5.00 % (i <br />Average site altitude : 7,300 feet <br />Material weight : 2,550 IbsILCY <br />Weight description <br />Farth -Dry packed <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job effidency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Attitude : >.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production : 345.91 LCY/hr <br />Adjusted fleet production : 345.91 LCY/hr <br />^. <br />. Fleet s¢e : 1 Dog(s) Total job Time : 7.06 Hours <br />Unit cost : $0.468 /LCY Total job cost : $1,143 <br />