My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119703
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:44 PM
Creation date
11/25/2007 7:32:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
6/15/2006
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatir~ Software <br /> <br />Task # : 291 <br />Date : 06/042006 <br />User : TAK <br />State :Colorado <br />Courtly : La Plata <br />Stte :King Coal Mine <br />PemtiVJob# : G81-035 <br />Ab~eviaflon :none <br />fi~name : C035-291 <br />Agertq or orgaMzafion name : CDMG <br />Pemtit or other job action : PR-8 <br />Task desaiption : Rough grade haul road <br />~ <br /> <br />_ . <br />-., <br />- <br />, <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series 11- 8SU Horsepower : 310 <br /> Blade type :Semi-Universa~ <br /> AttadlmeM no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization °~ <br />Cost Breakdown : Ownership cosfRtour : $53.92 NA <br /> Operating cosVhour : $75.29 100 <br /> Ripper op. costlhour : $0.00 0 <br /> Operator cost/hour : $32.53 NA <br /> Total unit cosi/hour : $161.74 Total fleet oosUhour : $161.74 <br /> <br />MATERIAL QUANTITIES ~- - -- ---~- -----J ---~- ----- - _~_.~ _ <br />• Initlal Swell <br />volume : 1,371 LCY factor : NA <br />Sauce of estirrta0ed volume : 1.7 acres x 0.5 R thick <br />Loose <br />volume : 1,371 LCY <br />Source of estimated swell factor : NA <br />r.~ _ _v._---~~~_~ ._____`---_ _.- ~ <br />HOURLY PRODUCTION ~ Job Cortdttion Catrediort Factors ~ Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 2.00 % (I <br />Average site altitude : 7,300 feet <br />Material weight : 2, 650 Ibs/LCY <br />Weight description <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficienq <br />Spoil pile <br />Push gradient <br />Attitude <br />Material weight <br />Blade type <br />Net correction <br />0.75 (avg.) <br />1.10 (Cat HB) <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />1.00 <br />0.46 <br />Decomposetl rock - 25% Rock, 75% Earth Adjusted unit production : 392.86 LCY/hr <br /> Adjusted fleet production : 392.86 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.49 Hours <br />. <br />Untt cost <br />$0 <br />412 /LCY T <br />l <br />b <br />: <br />. jo <br />ota <br />cost : $564 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.