Laserfiche WebLink
CIRCES Cost E~tlrrtatina Software <br />• <br />Task # : 271 Stale :Colorado Perrmtfjob# : C-81-035 <br />Date : 06/042008 County : La Plata Abbreviation : none <br />User : TAK Site :King Coal Mine Filename : C035-271 <br />Agerwy or organiration name <br />Permit ~ other job action <br />Task description <br />CDMG <br />PR-8 <br />surface facilities areas <br />Basic machine :Cat D8R Series 11- 8SU <br />Blade type :Semi-Universa~ <br />Attachment rro. 1 : BOPS Cab <br />Attachment no. 2 : 3-shank ripper <br />ofFce and coal stockpile areas) <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> ' Utilization <br /> Cost Breakdown : Ownership cosUhour : $53.92 NA <br /> Operating cost/hour : $75.29 100 <br /> Ripper op.cosUhour: $0.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cost/hour : $161.74 Total fleet cosUhour : $161.74 <br /> L.. _w _~ ._____ _ _ ~ ~ ---_~~_ ~ _ _ ~_~ ~-_,..___ w-- ~_ _. <br /> MATERIAL QUANTITIES <br />• Initial Swell Loose <br /> volume : 5,163 LCY factor : NA volume : 5,163 LCY <br /> <br /> Source of estimated voume : 6.4 acres x 0. 5 R thick <br /> Source of estimated swell factor : NA <br /> <br /> HOURLY PRODUCTION Job COrrditiorr Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br /> Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (1shiR/day) <br /> Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br /> Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br /> Average site altitude : 7,300 feet Material weight : 0.87 (Cat H8) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2, 650 IbstLCY Net cortection : 0.43 <br /> Weight description <br /> Decomposed mck - 25% Rock, 75% Earth Adjusted unit production : 366.14 LCYlhr <br /> Adjusted fleet production : 388.14 LCY/hr <br /> <br /> JOB TIME AND COST <br /> Fleet size : 1 Dozers) Total job time : 14.10 Hours <br />• it c <br />U <br />t $0 <br />442 /LCY t <br />T <br />l <br />b <br />t 2 <br />281 <br /> n <br />os <br />: . o <br />a <br />jo <br />cos <br />: $ <br />, <br /> ~__~ ___~ __ _._.._~ __ _ ._ __~ ____._ __._ _ V_ _ _____._ -_._-_. ~ _~ ~___ _ ___._~_~. <br />