My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119703
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:44 PM
Creation date
11/25/2007 7:32:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
6/15/2006
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CfFtCES Cost Estitnatirw Software <br />• <br />Task # : 101 <br />Date : 06/042006 <br />User : TAK <br />Agerky or orgartization name <br />Permit or other job action <br />Talc description <br />Basic machine :Cat D8R Series 1! - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Horsepower : 310 <br />Shift basis: 1 perday <br /> Data source : (CRG) <br /> Utilization °h <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br />Dozer operating cost/hour : $75.29 100 <br />Ripper operating cosUhour : $7.98 100 <br />OperatorcosUhour: $32.53 NA <br />Total unit cost/hour : $169.72 Total fleet cosfRrour : $169.72 <br />L_-_ <br />tiIIATEtigAL QUANTITIES <br />• Attemate methods - <br />Seismic : NA NA Load factor <br />Area : 1.60 aces Rip depth (fl) <br />Selerxed estimating method : Area <br />NA Bank volume : NA BCY <br />0.50 Volume : 1,291 BCY or CCY <br />Source of estimated quantity :Surface features map <br />Source of estimated bad factor : NA <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecontl <br />Unadjusted production : NA cu. yds./hour <br />1i V11VIUV11 liV 11GVlIV 11 rQVIVIJ- <br />Unadjusted production <br />per selected method : 1,207.44 cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 7,300 feet <br />Average ripping width : 7.08 feef/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 150.00 feeUpass Job effiaency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minuteslpass <br />Production per unit area : 0.748 arxes/hour Adjusted unit production : 1,002. >8 crr. yds./hour <br />Unadjusted production : 1,207.44 cu. yds./hour Adjusted fleet production : 1,002.18 cu. yds./hour <br /> <br />JOBT(MEANDCOST -____- ~--- --------- ------__...__.__-__ _--.---- ---__-___, <br />. Fleet s¢e : 1 dozers) Total job time : 1.29 hours <br />Unit cost : $0.169 per a. yd. Total job cost : $219 <br />State :Colorado <br />Courriy : La Plata <br />Site : Kinq Coa! Mine <br />CDMG <br />Permdljob # <br />Abbreviation <br />filctrame <br />G81-035 <br />none <br />C035-101 <br />Rip portal bench and Aorta! access road <br />_7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.