Laserfiche WebLink
F.XIIIBIT D - Reclama~ n Plan (continued) • <br />Sutherland Bros., Inc. <br />Page -3- <br />The equipment required will be one twenty-yard scraper, <br />one 65 1IP farm tractor, one disk, one seed drill, and one <br />fertilizer spreader or English Harrow. <br />The cost of such equipment on a contract basis is estimated <br />as follows: <br />20-Yard Scraper.... ..............$100/hour <br />65 HP Farm Tractor w/Implements......$ 25/hour <br />Mobilization of Equipment to Site....$500 <br />Equioment Utilization: <br />20-Yard Scraper............4 Hrs x $100/Hr = $ 400 <br />65 HP Farm Tractor <br />w/ Implements...........4 Hrs x $25/Hr = 100 <br />$ 500 <br />Mobilization ..............................$ 500 <br />Labor• <br />Ilours of Labor........ ...8 Hrs x $10/Hr = $ 80 <br />Seed & Fertilizer.....•$150/acre x 2 acres = 300 <br />Total Direct Cost ..............................$1,380 <br />Indirect Cost (15.8% of Total) ................. 218 <br />TOTAL RECLAMATION COST .........................$1,598 <br />Sixteen Hundred (1600) cubic yards of topsoil will be spread <br />on the affected two (2) acres (6" of topsoil average over area <br />of 87,120 square feet). <br />The topsoil will be hauled a maximum distance of Cive hundred <br />feet (500'). <br />Unit Cost <br />Topsoil Application .............$0.86/Cubic Yard <br />Seed and Fertilizer <br />Acquisition and Application...$290/Acre <br />-12- <br />