Laserfiche WebLink
<br />EXHIBIT C - Mining Plan (continued) <br />Sutherland Bros., Inc. <br />Page -3- <br />11. No refuse, acid-forming or toxic producting <br />material will be exposed during the operation. <br />12. There will be no disturbance of the hydrological <br />balance as no groundwater or surface water will be intercepted. <br />Natural runoff from the site will be contained on site by an <br />earthen berm. All operations' will be contained on the :site, <br />and, thus, no off-site damage of any kind will occur. <br />At the conclusion of the removal of gravel from each <br />area of approximately two (2) acres, topsoil will be spread <br />to a depth of approximately six inches (6"). The slope of the <br />reclaimed area will be one percent (1%). <br />13. The gravel will be crushed and screened on site. <br />A crushing plant utilizing a jaw or cone crusher with multiple <br />screen surface to separate various sizes of material will be <br />used. The crushing and screening plant will be portable and <br />moved within the site as removal of the gravel progresses. <br />Dust control utilizing a water spray system will be incorported <br />in the crushing and screening plant. No chemicals will be <br />used in the processing operation. <br />-9- <br />