Laserfiche WebLink
Facility Removal Costs <br />CDMG WEIGHTED AVERAGE COSTS <br />MEANS <br />Cost <br />MEANS SITE WORK COST DATA DESCRIPTIONS Used <br />Building Demolition large urban projects, <br />incl. disposal, steel <br />Slab on grade removal, rod reinforcing <br />(@75% of concrete) <br />Footer Removal (@25% of concrete) <br />Combined Rate for Concrete Removal <br />Chain Link, remove only, 8' to 10' high <br />Building Demolition large urban projects, <br />incl. disposal, wood <br />Building Demolition large urban projects, <br />incl. disposal, concrete <br />Railroad track removal, ties and track <br />Ballast <br />Conveyor Systems <br />Fuel Tanks Sludge Removal <br />Culverts <br />8 Inch. CMP <br />12 Inch. CMP <br />24 Inch. CMP <br />Underground Tank Removal <br />Powerline Removal <br />0.1290 <br />Remarks <br />Quantities used are in cubic feet <br />Quantities used are in cubic feet <br />Quantities used are in cubic feet <br />2.2646 Combined Rate for Concrete Removal <br />1.8267 Quantities used are in linear feet <br />0.1500 Quantities used are in cubic feet <br />2.1896 Quantities used are in cubic feet <br />5.8000 Quantities used are in linear feet <br />0.0985 Quantities used are in cubic feet <br />27.3232 Quantities used are in linear feet <br />206.6538 Each <br /> Quantities used are in linear feet <br /> Quantities used are in linear feet <br />5.4770 Quantities used are in linear feet <br /> Each <br />2.1400 Quantities used are in linear feet <br />Revision: TR-56 <br />BOND CALC TR 56 033104.x1s C+_2 Date: 4/14/04 <br />