Laserfiche WebLink
i • <br />STATE OF <br />Ofd Of THE STATE ENGINEER F'IFC~/VEO <br />dvbba of Water Rerowtn <br />Depamner+t ai Natural Resouces <br />1717 liamnn swear. Rowe eie <br />txeer.tblwadoeata] ~ ~9S '. <br />r~ iott~~s~~at RESPONSE TO RECLAMATION PERMIT I M~ne1~~Gao,(~y :.~~". <br />APPLICATION CONSIDERATION w.+e.~,e~..a <br />r.runr a~eaa <br />wi o. a:,e^., <br />TO: Curl B. Mount, Senior Environmentail Protection Specialist s.. r~~ <br />DMG~: d,-Q21-117 SITE NAME: Ga~~. ~t~~ ~<<~ <br />OPERATOR: _rD_ M . ~ ~ c.. COUNTY: ~c rs ~e.t- <br />LANDOWNER: ___(.o l14 , L,.~ . <br />LOCATION: SEC: ~_ TWP:1 l~l RNG: ~ PM: ~_ WD: ~_DIV: ~_ <br />CONDITIONS/STIPULATIONS FOR APPROVAL <br />_ The proposed oparatioa does not <br />aatit$ua e~mia5 pound water. Therefore, no <br />e~wrtre of pound Mater nn ocwr dueiag and <br />after mining operation. <br />_'ILe proposed opentioa enll eoatume <br />pound water hY _ evaporation, _ dual <br />control, _ tedawtion, _ wad Mato <br />removed in the mined product. Prior to initiation <br />of tbaro nsa o[ pound water, Ne appliaat will <br />need to obtain s Pavel well permit. Prior to <br />obtaiaioga permit, Raapprvuedwatersupply <br />plan or a deuced plan for augmentation wg7l be <br />roams <br />The appl <br />other Mater for ~ <br />storage is t~ <br />to provide evicts <br />permittedor de <br />t~t.n d oa <br />COMMF.NtS: <br />DATE; /- <br />EVALUATOR; <br />_ Prior to approvia` R Pavel well <br />permit, the appliant will need a wavier of <br />objeetioa tram well oMaen within 600 test <br />of tnqueat a hearing beforo toe Sute <br />Bngioasr. <br />The proposed opentioa may have <br />potential impact oa euttiag water rights <br />sear the project beatioa Please provide <br />evidence that the proposed project atL not <br />titer or impact the historic opsntioa of the <br />ssistiogaaterzigbts. Csnta.l~ s~n~ <br />b~4w (}nae.l A ~8.:} <br />Other: <br /> <br />cc: Division ~ Ottfce; M-4Q-Gl? File; Water Commissioner for WD~ <br />