My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119539
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:38 PM
Creation date
11/25/2007 7:14:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007031
IBM Index Class Name
Permit File
Doc Date
7/5/2007
Doc Name
Mining Reclamation Permit
From
DRMS
To
The Turquoise Connection, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the structure is to be compensated for by the Permittee or if such an agreement cannot be reached, an <br />engineering analysis establishes no damage will occur to the structure to the satisfaction of the Division; <br />and; <br />3. The proposed mining and reclamation operations can be carried out in <br />conformance with the requirements of the Act, and the Hazd Rock/Metal Mining Rules and Regulations. <br />E. The Permittee has made a showing satisfactory to the Board: 1) that it will employ, during <br />and after its underground mining and/or surface operations, procedures designed to minimize environmental <br />disturbance from such operation; 2) that it will provide for reclamation of the Affected Lands appropriate to <br />the subsequent beneficial use of such lands; and 3) that, in the event of the failure of its proposed <br />reclamation plan, it will take whatever measures may be necessary to assure the success of reclamation of <br />the lands affected by such operations in accordance with the Act. <br />F. A copy of the Permittee's application, as amended and supplemented, has been approved by <br />the Boazd and is, by this reference, incorporated herein. <br />G. The issuance of this permit does not relieve the Permittee from having to comply with all <br />applicable Federal, State and County statutes, including State water law. <br />GRANTS, CONDITIONS AND AGREEMENTS <br />The Boazd, in reliance upon the representations and promises made in the permit application, as <br />amended and supplemented, and the performance warranty, hereby issues a life of the mine permit to the <br />Permittee, to engage in the operations described in the application on certain lands lying in the County of <br />Teller, State of Colorado. These lands aze described in the permit application, as amended and <br />supplemented, and aze referred to herein as the "Affected Lands". <br />This permit is issued subject to the following conditions and agreements: <br />1) The Permittee will be bound by all applicable requirements of the Act, and all applicable <br />rules and regulations of the Boazd, as amended from time to time, the terms of the permit application, the <br />terms of the performance warranty, and the terms of the fmancial warranty filed with the Division. <br />2) The Permittee will file with the Division its annual report and fees on each anniversary date <br />of this permit. <br />3) L` analyses of the mining and reclamation operation and the data collected through <br />monitoring and experimentation by the Permittee or monitoring by the Division indicate that the operation <br />will not be able to comply with the requirements of the Act and applicable rules and regulations of the <br />Board, the Permittee hereby agrees to exercise its best efforts, after consulting with the Division, to modify <br />the plans to correct such deficiencies in the future. Such modifications may require technical revisions or <br />amendments to the permit. <br />4) The Boazd, or its authorized representative may enter upon the lands of the permitted <br />operation at all reasonable times for the purpose of inspection to determine whether the provisions of the <br />Act, Rules and Regulations, and permit have been complied with pursuant to C.R.S. 34-32-121. <br />
The URL can be used to link to this page
Your browser does not support the video tag.