My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119518
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:36 PM
Creation date
11/25/2007 7:13:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
2/12/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR78
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EsUmatina Software <br />pRO,lt ECT IDENTIFICATION <br />Task # : 174 <br />Date : 01/29/2007 <br />User: JRS <br />Agency or organization name :Colorado Division O/Reclamation, <br />Permit or otherjob action :Minor Revision 78 <br />Task description :Replace Topsoil from Stockp <br />to Drill Pads <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cesUhour : $72.92 NA <br /> Operating cesUhour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unk cosl8rour : $204.53 Total fleet costlhour : $204.53 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,650 BCY factor : 1.250 volume : 7,062 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted howdy production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiR/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altdude : 7, 900 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SUAI) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Drv packed <br />Adjusted unit production : 479.16 LCY/hr <br />Adjusted fleet production : 479.18 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 14.74 Hours <br />Unit cost : $0.427 /LCY Total job cost : $3,015 <br />PenniUob#:C-1996-083 <br />Abbreviation :none <br />Filename :C083-174 <br />And <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.