Laserfiche WebLink
ii iiii~~iiiiiii iii <br />999 <br />g' ~ Doc Date:12/11/2001 <br />• SECTION 6.0 Stock Tank and Dozer Basin Construction Through 1997. <br />6.1 Stock Tanks <br />This section updates the location of all constructed stock tanks through 1997 (see Map(s) 3 Section <br />3.0). The average tank denstty for Trapper mined-land areas will not exceed one tank per ten acres. <br />Table 8-1 describes the as-built tank denstty in association wtth the specific drainage areas. <br />In 1997, Trapper constructed no new stock tanks and there are no new stock tanks proposed for 1998. <br />Existing stock tanks meet applicable certification standards. <br />6.2 Dozer Basins <br />A5 a result of the approval of technical revision TR-73 (1/97), dozer basin locations will be provided in <br />this Appendix W document on an annual basis (see Map(s) 3 Section 3.0). <br />Dozer basins assist sediment impoundment's in the containment of sediment, reducing the frequency <br />• of Sediment Impoundment Leaning. Dozer basins are typically constructed along haulroads, regraded <br />spoils, and/or on short or long term disturbed sttes. <br />BDN 7/BB <br />[DMGB7REPT8~ <br />• <br />