Laserfiche WebLink
WESTERN SLOPE CARBON. INC. <br />u <br />MINE OFFICE-SOMEFSE T, COLORADO 01<3a <br />303.9795! 15 <br />b. Unit 2 <br />a. Continuous Miner Joy <br />b. Shuttle Cars Joy <br />c. Roof Bolter Jo, <br />d. Feeder Bret.ker Len <br />e. Scoop Tractor S b <br />1Z CM <br />10 SC, 22-48 5-A;; <br />RBD 8 (Fletcher {;tad) <br />g Airdox MFB}1 kosco <br />S BMUAT 86 Unitrak <br />c. Unit 3 <br />a. Continuous Miner Joc 12 C"1 <br />b. Shuttle Cars 2 Joy rose 22-46 BAC <br />c. Roof Bolter Joy RBD 8 (Fletcher Head) <br />d. Feeder Breaker Lung Airdox MFB`1 Rosco <br />e. Scoop Tractor S 6 S B?;U AT 86 Unitrak <br />d. Unit 4 <br />• <br />a. Continuous *:iner Jev 12 C". <br />b. Shuttle Cars 2 Joc lOSC 22-48 B-~C <br />c. Roof Bolter Long .ti rdox LRB-12C <br />d. Feed Breaker Long Airdox MFBA Rosco <br />e. Tractor S E S L'nitra;: <br />5. Coal is being mined in the 'F.' seam with 6' to 6!:' height. <br />6. _' marietta miners and 4 national mine torkars will be used for <br />spare sections and rock work. <br />B. All main fan installations meet criteria in Section 75.300-2 and <br />75.300-3 CFR 1975 (See Mine Fan Data Sheets, Appendices A and B). <br />C. Dust Control Flan <br />1. Belt Transfer and Loading Points shal] be equipped with one <br />water spray to control dust. This 2 GPM spra}~ shall be operated <br />at line pressure 100 psi whenever coal is being transferred. <br />More sprays will be added if necessary to control dust. <br />2. Belt and Track Haulage Systems <br />Fire valves along belt and haulage roads will be used to wet down <br />such roadways if dust is generated with operating equipment. <br />• <br />D. Methane and Dust Control Practices at Face Area <br />1. Line brattice or other suitable means shall provide ventilation [o <br />the working face from which coal is being cut. Line brattice will <br />A ^UISI DIA F' Y OF MORTMWLLT LM [ RG Y COMA M Y <br />