My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119294
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:15:03 PM
Creation date
11/25/2007 6:51:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Slurry Waste Cont., Ventilation Plan & Air Pollution Control Plan
Section_Exhibit Name
APPENDIX XXIV Section XXIV.3 to XXIV.6, Appendix XXV & XXVI
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Table 4. Thickener Underflow Analysis <br />Size +16 mesh 16 x 100 mesh -100 mesh Total <br />Weight 3.4 42.2 54.4 100 <br />Percent 13.1 17.88 37.34 29.2 <br />Ash <br />Btu/lb 12103 11860 8793 10069 <br />Percent 0.58 0.57 0.61 0.6 <br />sulphur <br />Table 5. Average Coarse Refuse Daily Production <br />• <br /> <br /> <br />Month Coarse <br />Refuse <br />(tons) <br />Days <br />Operating Daily <br />Average <br />(tons) <br />June 20,167 24 840 <br />July 11,041 12 920 <br />August 19,371 22 880 <br /> 50,579 58 860 <br />[dash plant modifications can be kept to a minimum by: <br />• Passing all jig rejects directly through the coarse <br />refuse crusher as opposed to screening prior to <br />crushing <br />• Pumping thickener underflow directly underground and <br />using the thickener underflow sump for coarse slurr}~ <br />preparation. <br />Transporting the dewatering equipment underground may pre- <br />sent some problems, as roof heights sometimes drop below 5 ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.