Laserfiche WebLink
iii iiniiiiuiuiii <br />999 <br />Doc Date:12/11/2001 <br />~~ P~° ~ ~ 3 <br />Page 3 <br />• Mr. Tom Pike <br />:March 14, 1980 <br />• <br />The Ford, Bacon and Davis Proposal is fairly idealized and not exact in tha <br />sense of showing where the slurry caill be placed and in what sequence. Tne <br />contingency plan for dewatering the slurry filled areas in the event the s;~:-p <br />cannot be constructed and utilized has not been presented either. The slurry <br />delivery system from the k'ash Plant to the vest mine should be provided. <br />Finally, there should be some clarification about the relationship between the <br />east mine sumps connected with the sediment control system for the east mine <br />bench and the early practice of disposing slurry in the west mine. <br />Sincerely, <br />C~~~ <br />David $olm <br />DH/co <br />• <br />