Laserfiche WebLink
May 3, 1997 <br />Dozing <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />Fidel D11N Ident [GRD PNDO11 ] Hourly O&O [ 236.22] <br />Blade Type [ UNIV.] Dual Tilt [ 100] <br />Dozing Distance (feet) [ 150] Spoil Pile Factor [ 80] <br />Operator [ 75] Minutes Worked per Hour [ 50] <br />Grade [ 0] Bank Material Density [ 2,798] <br />Material Factor [ 80] Loose Material Density [ 2,238] <br />Dozing Factor [ 100] Coefficient of Traction [ 100] <br />Visibility [ 90] Direct Drive Transmission [ 100] <br />Altitude [ 91] Bank cu yds to Move [ 8,200] <br />Theoretical Production Under Ideal Conditions (Loose cu yd/h) 1,839 <br />Total Adjustment Factor 0.3380 <br />Adjusted Hourly Production Estimate (Bank cu yd/h) 497 <br />Adjusted Hourly Production Estimate (Loose cu yd/h) 622 <br />Operating Hours to Complete Job 16 <br />Equipment Expense to Move Required Volume $ 3,779 <br />Equipment Expense per Bank Cubic Yard $ 0.4609 <br />• <br />• <br />Grade Sedimentation Pond 011 <br />25-6-3b Revised 06/23/97 <br />