Laserfiche WebLink
September 17, 1994 <br />Dozing <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />Model Di1N Ident [GRD PND010 ] Hourly 060 [ 236.~~ <br />Theoretical Production IInder Ideal Conditions (Loose cu yd/h) <br />Performance Adjustment Factors <br />Operator [ <br />Grade [ <br />Material Factor [ <br />Dozinq Factor [ <br />Visibility [ <br />Altitude [ <br />1,839 <br />75] Dual Tilt [ 100]1, <br />0] Spoil Pile Factor [ 80]' <br />80] Minutes Worked per Hour [ 50] <br />100] Hank Material Density [ 2,798] <br />90] Loose Material Density [ 2,238] <br />91] Direct Drive Transmission [ 100] <br />~Potal Adjustment Factor <br />:Adjusted Hourly Production Estimate (Bank cu yd/h) <br />:Adjusted Hourly Production Estimate (Loose cu yd/h) <br />Operating Hours to Complete Job <br />:Equipment Expense to Move Required Volume $ <br />:Equipment Expense per Hank Cubic Yard $ <br />0.3380 <br />497 <br />622 <br />30 <br />7,086 <br />0.4724 <br />u <br />• <br />25-6-2 <br />