Laserfiche WebLink
June 16, 1995 <br />Dozing <br />Page 2 <br />Estimate Track-type Tractor Productivity <br />Model D11N Ident [FNL DRNG CH] Hourly O&0 [ 198. <br />Blade Type [ UNIV.] Dual Tilt [ 105] <br />Dozing Distance (feet) [ 100] Spoil Pile Factor [ 100] <br />Operator [ 75] Minutes Worked per Hour [ 50] <br />Grade [ -13] Bank Material Density [ 3,843] <br />Material Factor [ 110] Loose Material Density [ 3,285] <br />Dozing Factor [ 120] Coefficient of Traction [ 100] <br />Visibility [ 90] Direct Drive Transmission [ 100] <br />Altitude [ 91] Bank cu yds to Move [ 3,932) <br />'.Cheoretical Production Under Ideal Conditions (Loose cu yd/h) 2,643 <br />'.Cotal Adjustment Factor 0.6377 <br />i~djusted Hourly Production Estimate (Bank cu yd/h) 1,441 <br />i~djusted Hourly Production Estimate (Loose cu yd/h) 1,686 <br />Operating Hours to Complete Job 2 <br />F'squipment Expense to Move Required Volume $ 397 <br />Fiquipment Expense per Bank Cubic Yard $ 0.1010 <br />• <br />• <br />25-6-tOb Revised 06/19/95 <br />