Laserfiche WebLink
March 22, 1995 <br />Dozing <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />Model D11N Ident [WA ADJSPOIL] Hourly O&O [ 198.~~ <br />Blade Type <br />Dozing Distance (feet) <br />Operator <br />Grade <br />Material Factor <br />Dozing Factor <br />Visibility <br />Altitude <br />UNIV.] Dual Tilt <br />100] Spoil Pile Factor <br />75] Minutes Worked per Hour <br />-10] Bank Material Density <br />110] Loose Material Density <br />120] Coefficient of Traction <br />90] Direct Drive Transmission <br />91] Bank cu yds to Move <br />'Pheoretical Production Under Ideal Conditions (Loose cu yd/h) <br />'Dotal Adjustment Factor <br />;adjusted Hourly Production Estimate (Bank cu yd/h) <br />;adjusted Hourly Production Estimate (Loose cu yd/h) <br />Operating Hours to Complete Job <br />I?quipment Expense to Move Required Volume $ <br />I'squipment Expense per Bank Cubic Yard $ <br />[ 105] <br />[ 100] <br />[ 50] <br />[ 3,843] <br />[ 3,285] <br />[ 100] <br />[ 100] <br />:?13,666J <br />2,643 <br />0.6035 <br />1,364 <br />1,595- <br />156 <br />31,034 <br />0.1452 <br /> <br /> <br />75-6-9 Revised X3/27/95 <br />