Laserfiche WebLink
• <br />TABLE A (continued) <br />MONITORING SITES 8 FREQUENCY <br />SURFACE FLOW JUNE- SEPTEMBER <br />REGULAR SAMPLING <br />CONTINGENT SAMPLING <br />(sample only when pumping site 1D9 or 1161s <br />discharging, between Z4 hours after Ne <br />tlischarge begins and 76 hours a11er It entls) <br />• <br /> <br />TR 01-38 <br /> WATER <br /> LEVEL & <br />SITE <br /> FIELD <br /> PARAMETERS <br />Foidel Creek <br />USGS 09243800 Schedule B <br />8 Schedule B <br />14 Schedule B <br />304 Schedule B <br />(flow only) <br />USGS 09243900 Schedule B <br />Fish Creek <br />16 <br />16A <br />302 <br />1002 <br />27A <br />1003 <br />307 <br />305 <br />Trout Creek <br />301 <br />69 <br />WATER LEVEL LAB <br />WATER QUALITY g FIELD EC SULFATE <br />AND LAB EC <br />Monthly only in Jun, Aug, Sept <br />Monthly only in Jun, Aug, Sept <br />Monthly only in Jun, Aug, Sept <br />Monthly only in Jun, Aug, Sept <br />Schedule B Monthly only in Jun, Aug, Weekly <br />Schedule 8 Monthly only in Jun, Aug, Weekly <br />Schedule B Monthly <br />Schedule B Monthly only in Jun, Aug, Sept <br />Schedule B Monthly only in Jun, Aug, Sept <br />Schedule B Monthly only in Jun, Aug, Weekly <br />Monthly -Flow o nly, fields semi-annually <br />Monthly -Flow o nly, fields semi-annually <br />Monthly <br />Monthly <br />Monthly Weekly <br />Monthly Weekly <br />Monthly Weekly (EC only) <br />1005 Monthly <br />Middle Creek <br />MC-1 Schedule B <br />USGS 09243700 Schedule B <br />29 Schedule B <br />Monthly only in Jun, Aug, Weekly <br />Schedule B <br />June- Monthly <br />Juy -Monthly <br />August -Weekly <br />Sept. - First two weeks of month <br />Exhibit 14$ <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />8/28/01 <br />