My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118934
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:39 PM
Creation date
11/25/2007 6:10:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 08i Sedimentation Pond F Design and Certification
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDIMENTATION POND F - As Built Specifications <br />• <br />- Sedimentation pond designed for 10-year, 24-hour event. <br />- Emergency spillway designed for 25-year, 24-hour event. <br />- Antecedent moisture condition II <br />- Weighted curve number - 71 <br />- Sediment volume - 1.03 Ac-Ft. <br />- Runoff volume - 1.21 Ac-Ft. <br />- Total volume - 2.24 Ac-Ft. <br />- Emergency spillway height above bottom of natural channel is less than <br />ten feet. <br />- Relative elevation top of dam - 101.3 <br />- Relative elevation top of decant - 99.5 <br />• - Relative elevation crest of spillway - 100.0 <br />- Depth of flow in spillway for 25-year, 24-hour event - 0.2 Ft. <br />- Relative elevation dewatering hole - 98.0 - <br />- Diameter of dewatering hole - 2 inches <br />- Detention time - 34.9 hours <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.