Laserfiche WebLink
APPENDIX F3 - ROC{< SLOPE TURNOUT PLAfa <br />• '~'} STEP 4 <br /> <br />The mine ventilating currents will then <br />be split and adjusted properly so that <br />one split of air ventilates the North <br />Mains and the other ventilates the Rock <br />Slope area. Some of the second split <br />will be used for fresh air in #6 Entry. <br />STEP 5 <br />u <br />1 <br />Mining the Rock Slope will now proceed 6 <br />as shown on the following pages. The <br />Fault Probe which is partially backfilled <br />with rock now will be completely filled. S <br />When this is done, additional backfill <br />will be placed in #6 Entry.. No coal 4 <br />will be backfilled with the rock. The <br />$6 Entry will not be filled to the roof, <br />allowing air to be coursed over the fill. , 3 <br />Crosscuts beEween $5 6 $6 will be back- ~ 1 <br />filled completely. 2 <br />NOTE: <br />The belt in $2 East Main will not be / <br />initially installed. ~/ <br />rf~ <br />W <br />_¢ m <br />~c~l /1 / <br />1 <br /> <br />• <br />000055 <br />_. <br />_. _. . __._.Mc- Vol III _ -- __.__-- _--- . <br />O <br />4g $~ <br /> <br />Rock Slopes <br />to Upper Coa <br />F: - 2 ~ <br />.:Page O = 6 ; - 10-13-97 <br />- Return From North <br />G~~ <br />~o <br />