Laserfiche WebLink
BASIC RECLAMATION COSTS BROKEN DO[+7N AS I'OLLOWS <br />A. LEVELING <br />1. 4840 Yd.2/acre at $.02/Yd.2 $100.00/acre <br />2. Acreage affected: 42 acres $ 4,200.00 <br />3. Equipment to be used: Blade <br />B. TOPSOILING <br />1. 2472 Yd.2/acre at $.55/Yd.2 $1359.00/acre <br />2. Acreage affected: 37.5 acres 50,985.00 <br />3. Equipment to be used: Loader/Dump <br />Truck/Blade <br />C. RESEEDING <br />1. 15 lb. seed at $31.00/acre (maximum $31.00 <br /> cost) <br />2. Labor and Equipment Cost: $35/acre $35.00 <br />3. Acreage affected: 22.7 acres 1,475.00 <br />Terrace Slope: <br />4. 10 lb. seed at $97/r.cre $97.00 <br />5. Labor and Equipment cost: $35/acre $35.00 <br />6. Acreage affected: 14.8 acres 1,960.00 <br />TOTAL COST OF RECLAMATION $58,620.00 <br />10~ Administrative Cost 5,862.00 <br />TOTAL COST FOR BONDING PURPOSES $64,482.00 <br />K-1 <br />