Laserfiche WebLink
~. <br />S~ <br />EXHIBIT C <br />MINING PLAN <br />Mining Plan <br />(a) Mining of the sand and gravel deposit is scheduled to commence <br />approximately February 1, 2000 and end approximately February 1, <br />2010. <br />(b). Topsoil depth is approximateljT 5" which is dark grayish brown loam. <br />Topsoil will be stripped and stockpiled from the active mining area. Sloping <br />of this stockpile will be no steeper than 3H:1 V and the slopes will be <br />mulched with straw to Rrevent wind and water erosion. Operator will also <br />seed stockpiles with a suitable cover crop to_minimize weed production. <br />Topsoil Stockpiling will be approximately 2,000 cu/yds. The topsoil <br />stockpiles will be located the SE corner of the pit. <br />(c) The subsoil is brown clay loam to 25" below that is brown, calcareous <br />clay loam. This overburden will be separately stockpiled in the manner <br />above (b). <br />(d) Thickness of the sand and gravel deposit is substantial ranging up to 72" <br />in depth. <br />(e) An access road will be built off of C.R. M. There will be no structures <br />erected. Sand and gravel material may be stockpiled or loaded directly <br />on county trucks for use on county roads. <br />(f) The pit will be operated as an open pit. There will be no improvements <br />and material stockpile dimensions will be determined to facilitate 3H:1 V. <br />(g) A haul road will be developed from C.R. M to the active mining area. <br />Haul road may need periodic grading to accommodate heavy truck <br />traffic. <br />