12/15/2000 12:29 719-543-1329 BARNHART AGENCY PAGE 03 <br />• • <br />Bob Oswald <br />Division of Minerals and Geology, Field Office <br />December 14, 2000 <br />Page 2 <br />Exhibit "C" -Pre-Minine and Minine Plan Maus <br />We agree that the maps now cleazer and depict better what is on the ground on-site. We have <br />re-done the maps with the typo error of 7645 feet to reflect 7635 feet. (Please see Prc-Mining and <br />Mining Plan Maps Revision date 12-12-00.) We agree that the Soils Map now has all of the correct <br />soil types labeled and shown correctly. <br />Exhibit "D" -Minine Plan <br />The Applicant/Operator understands that a Condition of Approval may be required when the <br />Rail Spur is constructed to notify the DMG Office. This is a commitment that the operator wiU <br />assume. No road building or hauling activity will be done between the mining area to the west and <br />the load-out to the east until all damage agreements have been established, with the proper entities. <br />When any concrete or any other structures are built the DMG Office will be notified and a <br />Bond Commitment will be agreed upon at that time. The Applicant/Operatorcommits to providing <br />the changes if needed to stabilize the Fish Ditch, either with a concrete lining or a steel or concrete <br />culvert pipe. We believe such a structure of pipe line would cost installed 518.00 to 525.00 per <br />running R.. <br />Exhibit "E" -Reclamation Plan <br />We hope that a Bond amount can be reached using our plan. <br />Exhibit ")F" -Reclamation Msa <br />A new map has been enclosed with Revision date 12-12-00 with typo error corrected to 7365 <br />feet. <br />