Laserfiche WebLink
Rule 2: Permits <br />n <br />U <br />• <br />r, <br />U <br /> Table 2.05.2-1 <br /> Lorencito Canyon Mine <br /> Reclamation Timeline [Five Year Mine Plan] <br />Location Mined Year 1 Year 2 Year 3 Year 4 Year 5 Cum. <br /> First Term 2003-2004 2004-2005 2005-2006 2006-2007 2007-2008 Totals <br />Raw Coal Loadout <br />Acres Disturbed 7.6 0 0 0 0 0 7.60 <br />Acres Reclaimed 0 0 0 0 0 0 0 <br />Jeff Canyon Haul Rd. <br />Acres Disturbed 6.9 0 0 0 0 0 6.90 <br />Acres Reclaimed 0 0 0 0 0 0 0 <br />Topsoil Piles <br />Acres Disturbed 2.3 0 0 0 0 0 ~ 2.30 <br />Acres Reclaimed 0 0 0 0 0 0 0 <br />Sediment Ponds <br />Acres Disturbed 2 0 1.9 1.2 2.8 2.5 10.40 <br />Acres Reclaimed 0 0 0 0 0 0 0 <br />Jeff Canyon Mine <br />Acres Disturbed 108 0 38 32 50 52 280.00 <br />Acres Reclaimed 20 88 0 34 30 37 209.00 <br />Total Disturbed 129 0 39.9 33.2 52.8 54.5 307.2 <br />Total Reclaimed 20 88 0 34 30 37 209 <br />Note: Reclaimed acres have been graded, seeded, fertilized and mulched. <br />2.05-3a <br />(Revised 9/30/03) <br />