Laserfiche WebLink
JOB DESCRIP'T'ION: <br />ROAD UNIT COST NUMBER OF UNITS SUBTOTALS/ <br />RECLAMATION TOTAL <br /> Because J.D. One mile of road, 14 ft. wide: <br />CONTOURING 440 will be on- -------------- <br />RESI-TAPING, site, unit cost is 3 passes w/ dozer and/or ripper. <br />SLOPING same 5280' @44 ft/min X 3 = 360 rains <br /> + 72 rains [80% EffJ + 10 rains <br /> [turnazound] =442 rains, PLUS $3794.00 <br /> ----------------- <br />side berm recontouring, 5280' @ <br /> Ol'/min = 5280 mitts + 348 miss <br /> (60%n effj _ total of 5628 miss <br /> ----------------- <br />total time = 6070 minutes <br />REVEGETATION: 1.7 acres estimated = $850.00 <br />SEED PURCHASE Same as above mulch/fertilizer extra $100.00 $950.00 <br />PLUS HAND <br />APPLICATION <br />SUBTOTAL, ROAD $4744.00 <br />JOB DESCRIPTION: UNIT COST NUMBER OP UNITS SUBTOTALS/ <br />TOTAL <br /> Load/unload = .5 hr each = 1 hr <br /> $85.00 per Round trip, Pueblo Wes[ to Site = 4 $765.00 <br />MOBILIZATION hour hour X 2 = 8 hrs= tota109 hrs <br />GRAND TOTAL $10,527.00 <br />PREPARED BY : C.L. FAIR DATE: Mazch 24, 2003 <br />REFERENCES: <br />CATERPILLAR PERFORMANCE HANDBOOK, EDITION 27 <br />JOHN DEERE COMPANY WEBSITE http://www.deere.com/en_US/deerecom/usa_canada.html <br />