Laserfiche WebLink
~I I I II II~ I II ~I~~ ~II <br />sss <br />TASK NO. TASK DESCRIPTION COST($) <br />1 Mobilize and demobilize CAT D8N (see 500.13 <br /> attached mob.-demob estimating form). <br />2 Seal Lucky Strike Shaft- poured in place 612.00 <br /> cap (from Inactive Mine Program Cost <br /> Factors- $17/sq. ft.- 36 sq. ft. opening). <br />3 Back-fill and grade cyanide pond (see 2172.00 <br /> attached dozer work estimating form for <br /> task no. 3). <br />4 Breach lower tailing pond (see attached 1840.00 <br /> dozer work estimating form for task no. <br /> 4) . <br />5 Eliminated. 00.00 <br />6 Place 1 ft. stockpiled soil on tailing 720.00 <br /> (see attached dozer work estimating form <br /> for task no. 5). <br />7 Seed and mulch 4 acres (includes cost for 2000.00 <br /> seed bed preparation, crimping of mulch, <br /> and re-seeding unsuccessful areas). <br />Subtotal.... ..................................... $7844.13 <br />15.8 percent indirect costs ........................... $1239.37 <br />TOTAL ................................................. $9083.50 <br />THE TOTAL BOND AMOUNT REQUIRED FOR THIS BITE IS $9100.00 (rounded) <br />