Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of < <br />K. PORTAL/SXAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (K): <br />____________ <br />1. DRILL ROLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (S) <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Descri ptian ~ Cost (S) <br />Demolition ~ <br />588 ~ Seeding ~ 55,438 <br />Fencing <br />9 ~ Nob/Demob ~ f1,619 <br />Subtotal (M ): ~ f7,057 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 51,052,440 <br />F <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD d PROFIT <br />Item Mo.~ Item Description ~ Cost (f) <br />1. ~ Public Liability Insuranee.... 1.550% of dir. ~ 516,313 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ 516,313 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f105 ,244 <br />G. ~ Job Superintendent.. <br />Subtotal (A): 5137,870 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f1,190,310 <br />_____ ___ <br />8. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Lost (S) <br />______r ~ _________~_r.______~____~_..___________~____ ~ ____________ <br />~ ~ <br />1. ~ Minerals Program Adm S.OOX of cntr.~ 559,515 <br />MET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): 559,515 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through 8): f197,385 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f1,2G9,825 <br />