Laserfiche WebLink
F7d-I~IT D - REQ~IMATION PLAN • <br />].. Most: of the backfilling will be done as the regular work progresses. <br />2. S1oF~es will be left very gradual for operating purposes. <br />3. C7o trop soil eaill need to be replaced for it would just wash down stream . <br />4. Situ will be examined to determine the reseeding conditions. <br />5. See letter from Soil Conservation Service - Exhibit B-1. <br />6. Seecing done by broadcasting. <br />7. No Ru1ch to be used. It would contaminate the water. <br />8. Only small ponds to remain after reclamation. No new buildings proposed. <br />Stream will still exist as it presently does. <br />9. No underground mine openings planned. ~daste rock stored along stream <br />edge to reduce erosion. <br />10. Actual cost of reclamation of property will consist of less than X1,000.00. <br />SEE ALSO E~IIBIT B-1 <br />