My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118600
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:18 PM
Creation date
11/25/2007 5:33:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Permit File
Doc Date
9/30/1977
From
OCCIDENTAL OIL SHALE INC
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~, <br />EXHIBIT D - t4ItlING PLAN <br />lJ <br />A. P1ining during the next calendar year will be done underground using a stope <br />mining method. Surface disturbances from mining include the addition of 195,000 <br />yd.3 of broken rock to the lower dump. lde currently hold a permit for an <br />additional 8.8 million yards on the lower dump. Surface preparation will be <br />made for raise boring pads. The raises will be bored for ventilation and off- <br />gas raises which are necessary to provide fresh air to the miners and provide <br />an avenue for retort waste gas from the underground viorkings. Surface pre- <br />paration will be made to provide an area for processing facilities. The area <br />will be used for all equipment and instruments necessary to process and collect <br />data for the underground retorts. <br />B. No earth moving is contemplated. <br />C. No water diversion or impounding facilities are anticipated. <br />D. F4oderate Disturbances: <br />A site of approximately 24,000 ft.2, graded and leveled, will be required to <br /> <br />set up raise boring equipment for boring ventilation and off-gas raises. <br />Another site of approximately 40,000 ft.2 will be leveled and graded to provide <br />an area for the surface processing facilities. The dump site, when filled to <br />the 8.8 million yd.3 capacity, will require approximately 30 acres. <br />Access roads will have to be provided to each of the above areas. However, <br />existing roads lie very close to the proposed areas and it is anticipated <br />that less than 200 ft. of additional road will be necessary resulting in a <br />disturbed area of approximately 2,800 ft.2. <br />E. Timetable <br />The enlargement of the lower dump will take place at about 16,250 yd.3 per <br />
The URL can be used to link to this page
Your browser does not support the video tag.