My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118578
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:17 PM
Creation date
11/25/2007 5:30:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Permit File
Doc Date
2/4/2000
Doc Name
COOLEY RESERVOIR FULTON WILDLIFE AREA PIT DMG PERMIT M-99-034
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III IIIIIIIIIIIII III <br />ADCO CONSULTING <br />CHEROKEE INVESTMENTS, INC. <br />2090 EAST 109TH AVENUE, SIATE 305 <br />THORNTON, COLOP^DO 80233 <br />February 4, 2000 <br />Mr. Tom Schreiner, Reclamation Specialist aFC,F'~~~0 <br />Division of Minerals and Geology ~-~ <br />1313 Sherman Street, Room 215 _'•~; " &Geo~d9~ <br />Ptah <br />Denver, Colorado 80203 ' <br />rana~~q;~ <br />Re Cooley Reservoir/Fulton Wildlife Area Pit <br />DMG Permit M-99-034 <br />13031 450-2204 <br />In regard the above permit, please find accompanying this letter the SPCC Plan, the Storm Water <br />Management Plan, and the Floodplain Use Permit for your records. In addition, CAMAS has <br />obtained the following permits in regard to air emissions and water discharge: <br />Fugitive Dust for Entire Operation - <br />(Preliminary Approval) <br />99AD0625F <br />Plant Machinery (All Final Approvals) - <br />93JE273P, EI Jay Crusher <br />94AD014P, Deister 6' x 16' Screen <br />94AD1101, Deister 8' x 20' Screen <br />94AD112P, Norber Cone Crusher <br />95JE586P, Gen Set Generator <br />Stormwater and Process Water Discharge - COG-500361 <br />You previously have been provided the Weed Control Plan, and the agreements with the Fulton Ditch <br />Company and PSCo. The items still to be completed and the status to complete each item are as <br />follows: <br />Technical Revision on slurry wall installation prior to slurry wall installation being <br />undertaken. Should be processed sometime later this year by CAMAS after slurry wall <br />contractor is selected. <br />Substitute Water Supply Plan and Gravel Well Permit issuance for Evaporative <br />Losses, prior to groundwater being exposed. Being prepared by Tuttle Applegate. <br />Approval of the Substitute Water Supply Plan and issuance of the well permit should <br />be completed in early spring ofthis year. <br />Groundwater Monitoring Plan prior to groundwater being exposed and slurry wall <br />being installed. Being prepared by Tuttle Applegate. Will be implemented prior to <br />slurry wall being installed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.