My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118575
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:17 PM
Creation date
11/25/2007 5:30:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m2004044
IBM Index Class Name
Permit File
Doc Date
10/12/2004
Doc Name
Pre-hearing Order
From
DMG
To
Parties and Interested Persons
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mayor, Janice E. Pawlowski <br />City of Brighton <br />22 South 4th Avenue <br />Brighton, CO 80601 <br />Marilyn Kent <br />16400 Tucson Street <br />Brighton, CO 80601 <br />Note: The Division of Minerals and Geology ("Division") shall not be a party, but shall <br />participate in the hearing as staff to the Boazd. <br />III. ISSUES <br />Presentations to the Board shall be limited to the following issues. The parties shall limit <br />presentations to the question of whether the pending application should be approved or denied, <br />based on the issues stated below. <br />1. Has the Applicant provided an effective plan for stabilization and protection of the <br />stockpiled material from wind erosion? (34-32.5-116(4)(j)) <br />2. Has the Applicant provided an adequate timetable and map to establish the relationship <br />between mining and reclamation? (Rules 6.4.4(1)(e), 6.4.5(2)(e) and 6.4.6) <br />3. Was the Applicant in violation at the time of application for the 27 acres to be transferred <br />from Pemut No. M-1991-140? (34-32.5-120.) <br />4. Has the Applicant proposed measures to minimize impacts to the hydrologic balance of <br />the Brattner and Brighton ditches? (Rule 3.1.6(1) and (3)) <br />5. Has the Applicant proposed measures to minimize impacts to the hydrologic balance of <br />Marilyn Kent's water well? (Rule 3.1.6(1)) <br />6. Has the Applicant adequately addressed the requirements for inert fill generated oustide <br />the approved permit azea? (Rule 3.1.5(9)) <br />IV. WITNESSES AND EXHIBITS <br />Pursuant to Construction Materials Rule 2.6(2), alI parties must exchange witness and exhibits <br />information as set forth below no later than 5:00 p.m. fifteen working days prior to the formal <br />Mined Land Reclamation Boazd hearing. <br />Parties must make a list identifying atI witnesses that each may call to testify during the hearing. <br />Identify each witness by name, address, phone number, azea of expertise (if any) and subject(s) of <br />
The URL can be used to link to this page
Your browser does not support the video tag.