11 r. w ,,I I 1 ' n ,J.:� _..1.` - -L7 -1 C— ,, _ -- i •„'tea'^; .� „•
<br />1 KERR -MGGEE .NI ,,•;. ,, `- ;; ^ii >' , Y9 '
<br />6ATHERING \ ";,,••`+,1 + ' I,r �S^ -• ' C� 1, `,,,•",, ;9•
<br />- '' NM `1 n �4 + '1 61,4, Ilw, , n , 1
<br />•I�rn,% Gil :•1
<br />M o TO EXISTING TUC°.�il�f)i1�1� T1 4) i E GE S'
<br />WELL W. I RN'T ,.y b'
<br />PROCESSING PL 0 __ ;x'1'46 UIOER
<br />/• P l 1 10 1 P 1
<br />MLR5 FERMI7N, ;
<br />,1 � 1 -- `� �� �� � '?ice _� rr �ii "- _ d_ � %r r '•- _- _ -_ 8r 'fir` i"1'i II I,i 1 r a
<br />I � ,
<br />V '
<br />I� Q
<br />f I 1
<br />1� j S �� , ' _'. � ` IM •i \�'�/�p�_ �'-y1' 1 M2 � Mplj 1 / � ,11 II % ti. Y
<br />-5- 4=- „:• {C y,` -_� �� : __ `w/ ' I• i `I I i' "I'/ �^^fN Qy, I pyl _ . -.
<br />- -- ` 4���a •' - -- -- - --- ----�- '• ?' �_ - -_ -_ -- i n nl0'' Irti��l ; ,,y,J,�M ',N'1 -.y �.� ,�Q�. �a..r5?,:
<br />-- --`.. \ �. _ ` p,?J�. _ - -_ _- - ..�- - ; i u -. ; 'r 1OJn'1 on,wPyl, 1 p -/” / , aN,. �, l` S .> i 11• '_ai, .
<br />t
<br />•y
<br />r ' ..; ) -_;' '�••_•yd'In ,�yyj ;; ; ''.i ,,. -.,,r' a, )`,',•j
<br />GE OF MINING ` _ p At
<br />%., �` -•.1__ - - - -- - i ` -`�•� ii, •, 1 `•\ ��'1,1M /t > "r'�•,n'
<br />IF AGREEMEKIi I az/ \� r" °,•a :; r. "• %( "' n` , -. o�
<br />I ✓ TO RELOCA
<br />PIPELINE IS
<br />TE �. �-
<br />:G 6 /� % / "
<br />APPROVED WIT}#
<br />PIPELINE OWAIER �� a __t+s'` '' ►+ n --
<br />APPROXIMATE- £>
<br />—� EDGE OF MIIJIUG
<br />LOCATION OF / WITHOUT AG REEMENT
<br />EXIST. GAS
<br />LINE TO BE T \.� --� •��`_'`� __ ?_ A_�% E +' •''
<br />O) RELOCATE PIPELINE
<br />RELOCATED 123.3 ACRES
<br />UPON OWNER a `� _o-- ; 1 rdI "t' 1 ✓
<br />APPROVAL
<br />- EX15TIK36
<br />FE)JGE TO
<br />TTLIN6 PONDT' qs
<br />• 9
<br />B REMOVED
<br />KSGHAR6E POINT 13 ,
<br />r
<br />I
<br />. 'r � MOR6AN SMIT44 -9
<br />s ; ' NATURAL. AREA, ^ ;_;
<br />PROPOSED
<br />LIMIT OF MINING MIUIJaG lu THIS AREA WILL BE 25' APPROXIMATE f } ,.•* '�
<br />EXCAVATION 0,671 UNLESS Au A6REEMEMT SETBACK L G iON OF 30' t ;,� ,.• --� ` � ,
<br />MUST BE 75' 1`5 ATTAIKED FROM TODD GREEK TODD GREEK SETBACK ' -�yr , +1 ,�•-'' , ','"
<br />FROM STOCKPILES FAPM5. FA12M5 AAETRO PER APRIL 2002 UDFCD TSM II J�
<br />i1J PM, 2A FOR D15TRIGT MASTER PLAN STUDY � 1 ;�'` d94e
<br />STABILITY WATERLINE RIVER BANK HAS BEEN / _
<br />5TAE51LIZED AND
<br />RE5TORE0 IN THIS
<br />AREA /
<br />C.ONVEYORMAUL ROAD `a9 6 ---------------
<br />- - -- ----- -----------
<br />/y
<br />SLURRY WALL �" , o • d�
<br />r 5ETBAGK 2
<br />IL
<br />O 1 ±81.3 ACRES MUNIK16 LIMIT I
<br />FURTTHEERT
<br />d /
<br />- 1 APPROVAL
<br />OF UDEFGD
<br />w
<br />0 I -- - - ,
<br />t� 12" PIPE FOR /'lam k l", ' /
<br />I DEWATERII�� 100 MINIMUM I /, ' PROPOSED
<br />i TOP OF BANK // ', APPROXIMATE -
<br />y SETBACK PER ` „ LOCATION OF
<br />I11 I „`\\ D ; UDFGD TODD GREEK
<br />Z - A ��� ! FARMS METRO
<br />J ;p°) �' DISTRICT WELL
<br />r
<br />_x 11 _- _0_- _o _-_ _ e 1•a ` > ,w.° ,p ,^" •� > p - , ^•
<br />'• /�X , t o^ �c „fs - t -i+ , L.1 , _ '"- ,� I , ` :yrc�ah .: :�:. -_r^_1,. _ r `, z.+J`49 ,�,.� •���4., . ;; ' ` �` � ff ; �1 ",' r I f,• u 1 l • D(ISTI _
<br />11117
<br />EASFIE XIU 5. GE 6
<br />5% REGTED) AV BOGY W9 %I AGE 981 I
<br />- P4
<br />1 1 (- ,I %
<br />,
<br />♦yri- h
<br />• { • 1 '
<br />�MINIKI6 LIMIT
<br />WITHOUT
<br />FURTHER
<br />51;fE APPROVAL
<br />0 ACCESS 5�TBACK OF UDtFGD
<br />N
<br />m 90 PON
<br />RESERVATION
<br />O
<br />TION 11
<br />1
<br />HAUL ROAD
<br />o' I OLIMIT OF
<br />MIN1KIG
<br />L'IEX( A\/AT I ON
<br />m
<br />� F
<br />------ SLURRY
<br />WALL
<br />° I RELOCATED DITCH
<br />rn ED '1 LATERAL TO BE
<br />o 14 RIO.W. I O II CaLRETE LINED 100 SETBACK TOP
<br />rnl - 30' OR PIPED. OF RIVER BAW
<br />APPROX. 5ETTLIN6 POND/
<br />i 5ETE5AZIV CDOE 015GHAR&E POINT
<br />xf ROW W 25'
<br />- O (69FdVEYOi� -x- SETBACK
<br />a k' } GRO\551AY�
<br />o
<br />I
<br />oN�� TS1 W8 boy
<br />0 1F C�n ' - - _ _;,c t. - -_ _ mac,- .7%."" ._•- _ - _- '.`....- - - - -
<br />T5MW4 p 1
<br />0
<br />w
<br />G
<br />0
<br />J
<br />d
<br />��• -� ,
<br />�r 1
<br />/\J1
<br />I A T
<br />A?f�RWMAftE LOCATIORI-DF TFI ..,.✓'"' I1'V'
<br />SOUTH PLgT>fE`RIVSQ'TOP
<br />11111W1. 11 AII&I
<br />MOR6AN 5MI114/
<br />I; TIATUY2AL AREA f;
<br />PE0 Ad IL 2002 L6FGA
<br />t MA$TE12:PLAN STUDY /
<br />RIVF,R bAKK,HA5
<br />BEEN 5TABILIZEq
<br />I" AND RESTORED "'" M ...•
<br />h IM; 71415 AREA
<br />.I rt{ 4(fifJ- r i
<br />i
<br />;I t
<br />1
<br />1
<br />'I Vf
<br />1+
<br />pIT64 LATERAL VERT
<br />OR OUTLET WI 1ER05IOM
<br />TUCSON SOUTH RESOURCE
<br />EAST AREA
<br />N
<br />L
<br />S
<br />0 100 200' 400
<br />SCALE IN FEET
<br />RE6ON5TRUGTEO SLURRY
<br />3:1 SLOPE WALL
<br />25.0 18.0' 12.0''_•
<br />SETBACK TO RESERVOIR PROPOSED
<br />TEMPORARY I ACCE55 RO EASEMENT
<br />VERTICAL 1
<br />EXCAVATION
<br />INTER IM
<br />1:1 SLOPE SECTION A -A
<br />NOT TO SCALE
<br />MINING NOTES:
<br />I. REFER TO GOVER5HEET /OVERALL PLAN FOR AOJAGEKIT PROPERTY
<br />OWIJER51 REFER TO EXISTING 60IJDITIOM5 SHEET FOR 50URGE OF
<br />SURVEY /TOPOGRAPHY, BEKK.HMARK, FLOOOPLAIN AND WETLANDS
<br />INFORMATION.
<br />2. ALOIJG THE SOUTH PLATTE RIVER, THE LIMIT OF MINING SHALL BE
<br />100 FROM THE TOP OF IMPROVED WEST BANK OF THE SOUTH
<br />PLATTE RIVER AS ALLOWED DY UREA N DRA I NA 6E AND FLOOD
<br />GOIJTROL OISTRIGT (LIOWGD).
<br />5. INSTALLATION OF THE PIPES UNDER 160TH AVENUE (51-+ 7) FOR
<br />TQAN5PORTIN6 AGGREGATE MATERIAL FROM PHASE I TO THE
<br />PROCCE5ING PLANT SHALL REQUIRE APPROVAL OF THE COLORADO
<br />DEPARTMENT OF TRANSPORTATION (COOT). TRUCK EXPORT OF
<br />AGGREGATE AND /OR SORROW MATERIAL SHALL ONLY EE ALLOWED
<br />BY APPROVAL OF THE COLORADO DEPARTMENT OF TRANSPORTATION
<br />(COOT) OF AN ACCESS PERMIT THAT MAY INCLUDE CON5TRUGTION
<br />OF ROADWAY IMPROVEMENTS DEEMED NECESSARY BY GDOT.
<br />4. AN ENGINEERING STABILITY ANALYSIS HAS SEEN PERFORMED TO
<br />ENSURE ANY MINING OGGURIN6 WITHIN 200' OF A MAN -MADE
<br />5TRUGTURE NOT OWNED BY THE APPLICANT /OPERATOR HAS
<br />ADEQUATE SETEACK. THE DISTAKVES REQUIRED BY THE STABILITY
<br />ANALYSIS ARE INCLUDED ON TP15 PLAN.
<br />5. FOR PHASE 2 AND 3, THE OPERATOR WILL USE DRY MINING
<br />TECHNIQUES AND EXCAVATE MATERAIL BY BAGKHOE, BULLDOZERS,
<br />AND SIMILAR EQUIPMENT. THE MINING FOR THESE PHASES
<br />WILL INVOLVE INSTALLATION OF A SLURRY WALL, DE- WATERING
<br />ACTIVE MINING AREAS, AND PUMPING WATER FROM DE- WATERED
<br />AREAS IN ACCORDANCE WITH THE DISUFARCE PERMIT. THE
<br />PHASE I MINE AREA WILL BE WET MINED.
<br />G. TOPSOIL AND OVERBURDEN 5TOGKPILE5 SHALL BE TEMPORARILY
<br />STORED IN THE AREAS SHOWN. THE STOCKPILES IN THE FLOOOPLAIN
<br />SHALL BE ALIGNED PARALLEL TO THE FLOOD -FLOW DIRECTION OF THE
<br />5. PLATTE RIVER, HAVE A MAXIMUM HEIGHT OF 30', A MAXIMUM LENGTH
<br />OF 500', MAXIMUM 3H:IV SLOPES, AND A MINIMUM OF 100' BETWEEN
<br />5TOGKP I LES.
<br />7. OVERBURDEN AND TOPSOIL STOCKPILES ABOVE EXISTING GRADE,
<br />THAT ARE EXPEGTEO TO BE PRESENT FOR OVER I YEAR, WILL BE
<br />SEEDED WITH A TEMPORARY SEED MIX AS WEATHER PERMITS.
<br />0. 5TO6KPILED TOPSOIL WILL BE 5EGRE6ATED FROM OTHER SPOIL.
<br />9. THE OPERATION WILL INVOLVE CONCURRENT MINING AND RECLAMATION
<br />WITH FINAL SLOPES BE I N6 3H:1 V. AND PLACEMENT OF G" TOPSOIL ON ALL
<br />RECONSTRUCTED AREAS ABOVE THE PROPOSED HIGH WATER LEVEL OF
<br />THE FUTURE RESERVOIR: AND OTHER DISTURBED AREAS AS NECESSARY.
<br />10. TETRA TECH RMG ING. 15 NOT RE5POII5I5LE FOR SAFETY, IN, ON, OR
<br />ABOUT THE PROJECT 51TE, NOR FOP )MPLIAKJGE BY THE
<br />APPROPRIATE PARTY OF ANY REG0LA1IUN5 THERETO.
<br />11. A MINIMUM OF TEN (10) FEET OF CLEAN AK)GE FROM ANY EXISTING
<br />POWERLIKIE OR FUTURE POWERLIKIE SHALL BE MAINTAINED AT ALL
<br />TIMES AS OUTLINED BY STATE STATUTES.
<br />12. UTILITIES SHOWN ON THIS PLAN WERE FIELD LOCATED AT THE
<br />TIME OF PLAN PREPARATION. FOR 5AFTEY. THE OPERATOR
<br />SHOULD LOCATE UTILITIES PRIOR TO SLURRY WALL GON5TRUGTION,
<br />OR MINING ACTIVITY,
<br />13. SLURRY WALL SHOWN HEREIN 15 GENERAL LOGATION ONLY. REFER
<br />TO THE SLURRY WALL DESIGN PLANS AND SPEC.IFIGAITON5 FOR
<br />DESIGN LOGAT I ON.
<br />14. PRIOR TO OI5TUR5ANGE OF ANY WATERS OF THE U.S., Al WILL
<br />GET APPROPRIATE APPROVALS FROM THE U.S. ARMY 6ORP5 OF
<br />ENGINEERS.
<br />15. NO IRRIGATION OITC.4E5 WILL B,E DISTURBED UNTIL AN AGREEMENT
<br />HAS BEEN REACHED WITH THE DITCH COMPANY.
<br />16. MINING OR FILL PLACEMENT IN THE "WEST FILL AREA" WILL BEGIN
<br />IQ DECEMBER THROUGH FEERUA2Y. IF M I N I KIG OR FILL ACTI V ITY MUST
<br />5E61N OURIKI6 THE MONTHS OF MARCI-F TO NOVEMBER, AGGREGATE
<br />INDUSTRIES -W02, INC. WILL SURVEY TO DETERMINE IF BURROW OWLS
<br />ARE PRESENT.
<br />PROPOSED TODD GREEK FARMS
<br />METRO 015TRI6T NO. I WATERLINE
<br />PROPOSED
<br />UKIDE12620UND
<br />POWERLINE
<br />PROPERTY LINE OR
<br />LIMIT OF MAXIMUM
<br />D15TUR5ANGE
<br />TUCSON SOUTH RESOURCE
<br />MLRB 112 PERMIT
<br />MINING MAP
<br />A TQA T F
<br />G O LAND LOCATED IM THE NE 14
<br />SWIM AMD SEIM OF 5EGTIOIJ I
<br />AIJD THE OF HWI /4 OF 5EGT10K1 12,
<br />TOWIJSPIP I SOUTH. 32AKI&E 67 WEST
<br />OF THE GTH P.M.,
<br />GOUtJTY OF ADAM5, STATE OF COLORADO.
<br />GOHTA I N I KI& 250.71± AGRE5
<br />TOTAL AFFECTED LAND 291.5 + /- ACRES
<br />LEGEND:
<br />TUCSON STREET CONVEYOR CROSSING DETAIL
<br />MOT TO SCALE
<br />MOTE:
<br />THI5 DETAIL 15 IWEKIDED TO BE CONCEPTUAL DESIGN. INSTALLATIOu
<br />OF THE COWEYOR GROSSING BOX UNDER TUCSON STREET 15 SUBJECT
<br />TO APPROVAL OF ADAMS COUNTY PUBLIC, W012K5 DEPT. AND 00020IKIATION
<br />WITH EXISTING UTILITIES.
<br />CERTIFICATION:
<br />THIS MAP WAS PREPARED BY TETRA TECH RM C, IN
<br />COOPERATION WITH A6612E,5ATE IKIDU5TRIE5 -WVG2, INC.
<br />AGGREGATE WILL KEEP THE DIVISION OF MINE :RAL5 NOT TO SCALE
<br />AND GEOLOGY IKIFO12MED OF AMY C44AKIGE5 TO THE
<br />MINIKI6 OR REGLAMA LAMS THROUGH AKMIUAL
<br />REPOR 5 AMID FILE EGH % REVISIONS OR AMEND- RECORD DATE DESIGNED 9v: KF
<br />MENT E OF AS EGESSARY THROUC�IKOUT TETRA TECH RMC
<br />FE OF TH E. /1 ADEfrUAGY REVIEW IP -70 -04 II -17 -04 PREPARED BY: �T�
<br />✓� KF TEL 303.7725282 METRO 303.665.6283 LONGMONT, CO 80501
<br />KARE F[AKIDERS DATE. CHECKED 8Y:__,
<br />303.665,6959
<br />PROPERTY BOUNDARY
<br />• AFFECTED LAND /PERMIT
<br />BOUNDARY
<br />/ ap AFFECTED LAND IN
<br />ADJACENT R.O.W.
<br />100 YR. FLOOOPLAIN
<br />EXI5TIN6 WATER
<br />- -
<br />4,940- - EXISTING 2' CONTOURS
<br />K EXISTING FENCE
<br />Q EXISTING TREES
<br />°' UTILITY POLE
<br />E ELEGTRIG LINE
<br />G 6A5 LINE
<br />W WATER LINE
<br />T TELEPHONE LINE
<br />0 TELEPHONE RISER
<br />© WATER METER
<br />c ^ EX15TIW NON- JURISDICTIONAL WETLANDS
<br />MONITORING WELL LOCATION
<br />SLURRY WALL
<br />RELOCATED DITCH LATERAL
<br />LIMIT OF MINIWI EXCAVATION
<br />MIHING PHASE LINES
<br />— — — — P12OGE551NG AREA
<br />0 Q ON 51TE HAUL ROAD /C.ONVEYOR
<br />PROPOSED ACCESS
<br />®OVERBURDEN E TOP501L
<br />STOCKPILES
<br />OTOPSOIL BERM W/ G12A55
<br />COVER 56REENIKIG
<br />FINISHED PRODUCT 5TOCKPILE5
<br />SETTLING POND /DISCHARGE POIKrf
<br />RECEIVED
<br />NOV 2 2 2004
<br />nivision of Minerals and Rea"
<br />JOB NO: TUCSON SOUTH RESOURCE Or
<br />SO- 3919.019.01 MINING PLAN
<br />Permit #: Confidental?: (/G'
<br />Class: ^ t,, —+
<br />Type-Seq.:
<br />From: —
<br />To: /)
<br />Doc. Name: S� �
<br />Doc. Date (if no date tamp):
<br />Specialist: / I. ir,T7�
<br />
|