Laserfiche WebLink
<br /> <br />CLEARLY <br />14. Present land use <br />~a FI C4.I6UN4~ ni11.VING <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed future land use R~ y~ ~ o n ~~ al _ ~~ 1 1 e ~„S <br />(Goal of reclamation) pe f ,, r.~n f ~ M ~..~ T r ~ ~_~. ~ ~ <br />INSTRUCTIONS: This application form must be submitted in duplicate d each farm must <br />be accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (fo Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidanc . <br />ERHIBIT A - Legal Description <br />The legal description must identify the affected land and be wh lly adequate for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section t at least the <br />nearest quarter quarter section. Sdhere applicable, the street dress or lot <br />number(s) may be used. <br />EXHIBIT B - ~iiininq Plan ~ -4-e~ ,-LU~C.e L. a. 3 9` <br />This can be a general discussion of the methods, equipment, pha <br />the operation and those portions of land affected by each. The <br />closely correlated with the map and should show where extractio <br />direction it will proceed. <br />E.~IBIT C - Mao ,~.Q ~R <br />This map should be as comprehensive as possible in terms of <br />the pezmit boundaries and indicating all roads or stockpile <br />connection with the operation. All immediately adjacent 1a <br />The closest quarter section corner, section Line, or any of <br />should also be shown onlhe tpap.~ ~ W C O ?~ 5 <br />EXHIBIT D - WildlifeG_ Water Reso <br />tion and So <br />Each of the above-m~+ntioned subjects must be addressed as ou <br />applicable Rule, under item number ten (10). <br />EXHIBIT E - Reclamation Plan.S S~e.Q C~r...a~~-- ~..~ <br />As with the mining plan, this should be a general discussion of <br />equipment, phases or stages of the reclamation process and thos <br />land affected by each. If possible, the plan should be closely <br />with the map. If not, the narrative must be comprehensive enou <br />accurate verbal picture of the expected physical appearance of <br />completion of reclamation. <br />EXHIBIT F - Proof of Local Government Approval ~o~i_ zU..u, <br />This must be a letter from the local government specifying conf <br />existing zoning regulations. <br />EXHIBIT G - Source of Legal Right to Enter <br />Ses <br />with <br />This could be a~COpy of the lease, deed, abstract_of._titles or urrent tax <br />..._. _ <br />----- <br />receipt. In lieu thereof,--a st~em~eat ac§nowledged by a notary public that <br />the operator has the legal right to enter and mine will be acce ted. <br />**FOR SPECIAL 10-DAY PEIL`1ITS ONLY** <br />EXHIBIT H - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator st submit <br />facts to support such request. Otherwise a surety of $2500 wil automatically <br />be set. <br />E~lIBIT I - Terns of Governmental Contract <br />The operator must submit a copy of the contract or other proof <br />necessity of a special 10-day permit. The operator must also <br />of the surety provided under the governmental contract, if it <br /> <br />s or stages of <br />lan should be <br />will begin, which <br />ly defining <br />to be used in <br />rs must be shown. <br />cateable point <br />the aethods, <br />portions of <br />to draw an <br />area after <br />t proves the <br />it evidence <br />required. <br /> <br />