•
<br />C~
<br /> A B C D E F G H 1 J K L
<br /> Project Area Description
<br />
<br />2
<br />8/18/1997 origina
<br />_ _ __
<br />l Reviscd 1219/97 -
<br />-
<br />- -
<br />-
<br />-
<br />-
<br />~
<br />3 _
<br />_ _
<br />~ - ~ --- ~ - - - - - - ~ -- - ---
<br />4 SOIL SOURCES _
<br />__ _ __ _ Soil Inches Soil %° after Top Soil Acres Net Inches Cu Yd Cu Yd Avai CuYd Used _CuYd for
<br />6 __ _ Available ScalDine Acres Reclaimed Afler Scelo _
<br />Inolace for Redam for Reelam Elsewhere
<br />6 __ _ __ _ - - _ _ -
<br />- - __ - --- - __ - -
<br />7 Gravel Bar Plan[ & Phase 1 Area PhaselA
<br />
<br />8 _ _ _ _ _ _ _ _
<br />9 _ _ _
<br />65%
<br />9.50
<br />9.50
<br />5.65
<br />7,472
<br />9,340 _ _ _
<br />11,495 _ _
<br />2,155
<br />9
<br />
<br />10 _
<br />-
<br />
<br />-
<br />-
<br />- - ~--
<br />-- ---
<br />11 -- --- ---
<br />12 _
<br />- Plant -- --
<br />
<br />13
<br />_
<br />---
<br />5.5
<br />40%
<br />18.1
<br />18.1
<br />2.2
<br />5,354
<br />6,692 _
<br />21,901 __
<br />-15,209
<br />14
<br />- Scalp >4" - - ---
<br />15 - -
<br />16 _ Phase lB
<br />17 _ 12 80% 7.3 7.3 9.6 9,422 11,777 0 11,777
<br />18 10 50% 7.3 7.3 5 4,907 6,134 0 6,134
<br />19 _ Scalp>4"
<br />20
<br />21 _
<br />-
<br />22 -
<br />23 -
<br />24 _ _
<br />25 Granlle Quarry Phase 1 & Plant Area 6 55% 28.3 28.3 3.3 12,556 15,695 13,697 1,998
<br />26
<br />27 Sandstone Quarry Area 6 30% 3 3 1.8 726 908 1,452 -545_
<br />28
<br />29 Vlsual Berms: SE Area B, Wyes, Loop, West Area 12 80% 8.3 8.3 9.6 15,865 19,631 10,043 9,78
<br />8
<br />30 Top Soll Area 4 4
<br />- _
<br />-
<br />31 - _ - -
<br />32 Roads, Railroads, BuRers, Pond,Servic 39.06 9 75% 26_12 14_03 fi.75 23,704 29,630 16,976 12 654
<br />33 Area & Quarry Storm Water Berms
<br />
<br />34
<br />Total
<br />104.6
<br />99.8
<br />80,005
<br />100,006
<br />75,Sti5 _
<br />24,442
<br />35 -
<br />-- - -- - -
<br />- ---
<br />-
<br />36 -
<br />37 RY AFTER RECLAIMING PHASE I
<br />MENTA
<br />SUPPLE __ ~
<br />38 _
<br />_
<br />Granite Quarry Phase 1l____ __ _ _
<br />__ 6 _
<br />_ 40% 19.0 19.0 2.4 6,131 _ 7,663 ____
<br />__ 9,196 _
<br />-1,533
<br />39 Gravel Pit Phase II 8.5 80% 18.2 18.2 6_8 16,639 20.799 22,022 -1123
<br /> _ - - --- - -~- - --
<br />40 ---- - ---Total
<br />---- ------ - J7.2 37.2 22,770 28,462 31,218 (2,756)
<br />41
<br />
<br />42 _ ____ _
<br />FTE
<br />R RECLAIMING PHASE II
<br />SUPPLEMENTARY A __ _ ___ _ __ ___ ____ _
<br />
<br />43 _
<br />_
<br />Granite Quarry Phase 111 _ __ _ _ _ __
<br />fi ___
<br />40°/ _
<br />17.0
<br />17.0
<br />2.4
<br />_ 5,485 ___ _ _
<br />6,857 _ _ _
<br />8,228
<br />-1,371
<br />44 _
<br />Gravel Pit Phase 111 --- - - - - - - 10 -- - 85% 19.8 19.8 __
<br />8_5 22,627 _
<br />28,284 _
<br />23,958 44 )26
<br /> ---
<br />-
<br />- - - --
<br />~
<br />-
<br />45 -_----_--_-_ --- __Total -_-_ --__- _
<br />_ _ _
<br />_
<br />_ 36.6 _ __36.8 -__ _ 28,112 35,140 32,186 2.954
<br />46 I Total Ac LoM Disturbed 178.11 I7J.8
<br />
|