Laserfiche WebLink
• <br />C~ <br /> A B C D E F G H 1 J K L <br /> Project Area Description <br /> <br />2 <br />8/18/1997 origina <br />_ _ __ <br />l Reviscd 1219/97 - <br />- <br />- - <br />- <br />- <br />- <br />~ <br />3 _ <br />_ _ <br />~ - ~ --- ~ - - - - - - ~ -- - --- <br />4 SOIL SOURCES _ <br />__ _ __ _ Soil Inches Soil %° after Top Soil Acres Net Inches Cu Yd Cu Yd Avai CuYd Used _CuYd for <br />6 __ _ Available ScalDine Acres Reclaimed Afler Scelo _ <br />Inolace for Redam for Reelam Elsewhere <br />6 __ _ __ _ - - _ _ - <br />- - __ - --- - __ - - <br />7 Gravel Bar Plan[ & Phase 1 Area PhaselA <br /> <br />8 _ _ _ _ _ _ _ _ <br />9 _ _ _ <br />65% <br />9.50 <br />9.50 <br />5.65 <br />7,472 <br />9,340 _ _ _ <br />11,495 _ _ <br />2,155 <br />9 <br /> <br />10 _ <br />- <br /> <br />- <br />- <br />- - ~-- <br />-- --- <br />11 -- --- --- <br />12 _ <br />- Plant -- -- <br /> <br />13 <br />_ <br />--- <br />5.5 <br />40% <br />18.1 <br />18.1 <br />2.2 <br />5,354 <br />6,692 _ <br />21,901 __ <br />-15,209 <br />14 <br />- Scalp >4" - - --- <br />15 - - <br />16 _ Phase lB <br />17 _ 12 80% 7.3 7.3 9.6 9,422 11,777 0 11,777 <br />18 10 50% 7.3 7.3 5 4,907 6,134 0 6,134 <br />19 _ Scalp>4" <br />20 <br />21 _ <br />- <br />22 - <br />23 - <br />24 _ _ <br />25 Granlle Quarry Phase 1 & Plant Area 6 55% 28.3 28.3 3.3 12,556 15,695 13,697 1,998 <br />26 <br />27 Sandstone Quarry Area 6 30% 3 3 1.8 726 908 1,452 -545_ <br />28 <br />29 Vlsual Berms: SE Area B, Wyes, Loop, West Area 12 80% 8.3 8.3 9.6 15,865 19,631 10,043 9,78 <br />8 <br />30 Top Soll Area 4 4 <br />- _ <br />- <br />31 - _ - - <br />32 Roads, Railroads, BuRers, Pond,Servic 39.06 9 75% 26_12 14_03 fi.75 23,704 29,630 16,976 12 654 <br />33 Area & Quarry Storm Water Berms <br /> <br />34 <br />Total <br />104.6 <br />99.8 <br />80,005 <br />100,006 <br />75,Sti5 _ <br />24,442 <br />35 - <br />-- - -- - - <br />- --- <br />- <br />36 - <br />37 RY AFTER RECLAIMING PHASE I <br />MENTA <br />SUPPLE __ ~ <br />38 _ <br />_ <br />Granite Quarry Phase 1l____ __ _ _ <br />__ 6 _ <br />_ 40% 19.0 19.0 2.4 6,131 _ 7,663 ____ <br />__ 9,196 _ <br />-1,533 <br />39 Gravel Pit Phase II 8.5 80% 18.2 18.2 6_8 16,639 20.799 22,022 -1123 <br /> _ - - --- - -~- - -- <br />40 ---- - ---Total <br />---- ------ - J7.2 37.2 22,770 28,462 31,218 (2,756) <br />41 <br /> <br />42 _ ____ _ <br />FTE <br />R RECLAIMING PHASE II <br />SUPPLEMENTARY A __ _ ___ _ __ ___ ____ _ <br /> <br />43 _ <br />_ <br />Granite Quarry Phase 111 _ __ _ _ _ __ <br />fi ___ <br />40°/ _ <br />17.0 <br />17.0 <br />2.4 <br />_ 5,485 ___ _ _ <br />6,857 _ _ _ <br />8,228 <br />-1,371 <br />44 _ <br />Gravel Pit Phase 111 --- - - - - - - 10 -- - 85% 19.8 19.8 __ <br />8_5 22,627 _ <br />28,284 _ <br />23,958 44 )26 <br /> --- <br />- <br />- - - -- <br />~ <br />- <br />45 -_----_--_-_ --- __Total -_-_ --__- _ <br />_ _ _ <br />_ <br />_ 36.6 _ __36.8 -__ _ 28,112 35,140 32,186 2.954 <br />46 I Total Ac LoM Disturbed 178.11 I7J.8 <br />