Laserfiche WebLink
Reclamation Costs <br />Exhibit L <br />The worst case scenario for the site occurs at the end of mining Phase I. Topsoil will have <br />been stripped from Phase 1 and 2, which would require topsoiling of the Phase 2 and areas of <br />Phase I down to 5 feet below the water table. The slopes of Phase 1 would require regrading. <br />Phase 2 and parts of Phase 1 would require dry rangeland revegetation and the wetland fringe <br />of the pond would require revegetation. The culvert would also be installed in Phase 1. <br />Reclamation Costs <br />Task Description Quantity Cost Total Cost Duration (mn) <br />Grnde Final Phase Slopes 3,000.OOCYD $0.30 /CYD $900 0.20 <br />Re-grade Slopes of Phase 1 23,000.OOcyd $0.30 /cyd $6,900 0.25 <br />Topsoil Phase 2 and above 8,500.00 cyd $0.50 /cyd $4,250 0.25 <br />water areas of Phase 1 <br />Seed and Mulch Dry 9.32 acres $900.00 /acre $8,388 0.25 <br />Rangeland Area of Phases 1 <br />and 2 <br />Seed Wetland Fringe of Phase 0.18 acres $1,100.00 /acre $198 0.25 <br />l <br />Install Culvert at outlet of lake. 1.00 $1,000.00 $1,000 0.10 <br />Total $21,636 1.30 <br />DMG Coat: 21°fo of the Direct Costs $4,544 <br />Total Bond Amount $26,180 <br />5!26!2005 Page 1.-1 <br />