Laserfiche WebLink
Final Reclamation Timetable <br />The site will be mined and reclaimed in phases in order to minimize the disturbed azea. It is <br />expected that at the end of the mine life all areas except for the last mining area will have been <br />reclaimed. All fmal reclamation tasks for this scenario can be seen below. <br />Final Reclamation Time Table <br />Task Description Darahon (Months) <br /> <br />Regrade Slopes of Phase 5 0.20 <br />Topsoil Phase 5 0.10 <br />Seed Topsoiled Areas 0.10 <br />Seed Wetland Ftinge 0.10 <br />Install Drainage CMP 0.00 <br />Total <br />130 <br />1 ]/7/2005 Page E-5 <br />