My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118347
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:02 PM
Creation date
11/25/2007 5:07:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005075
IBM Index Class Name
Permit File
Doc Date
11/28/2005
Doc Name
Appl.
From
Oldcastle SW Group Inc. dba Four Corners Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Health and the Environment, the national Response Center, the Colorado Emergency <br />Planning Committee, or the State Oil Inspector. The operator shall notify the Office of a <br />reportable spill within the permit azea using the same timeframe required by the permit, <br />license, notice, Act, Rule or Regulation governing the reporting of the spill to the appropriate <br />agency. Notice of a reportable spill shall be Faxed to: Minerals Program Supervisor, Division <br />of Minerals and Geology, FAX (303) 832-8106. The FAX shall include acall-back number of <br />a responsible company official for the DMG staff to use as a contact " <br />No explosives will be used on this site for the purpose of mining or processing. No chemicals <br />will be used in the gravel processing. <br />Production Rates <br />The site's production volumes and rates can be seen below. An annual expected average and <br />maximum rate are shown. The life expectancy of the pit is based on the average rate. <br />Construction Materials Annual Production <br />Use Ma: Rate([) Average Rate(t) Reject Rate(%) Raw Material(t) <br />Asphalt 200,000 35,000 10% 38,500 <br />Aggregate 21Q,000 190,000 0% 190,000 <br />Concrete Aggregate [00,000 75,000 ]0% 82,500 <br />510,000 300,000 4% 311,000 <br />Schedule of Operations <br />The mine is expected to operate from 5:00 AM to 9:00 PM. This schedule is based on the <br />Chambers Pit to the west of this site. When the portable crushing plant is on site, it runs about <br />14 hours per day 6 days per week. Operating hours will be based on product demand. <br />Mine Area Details <br />The expansion's reserves are divided into phases. While one phase is being mined the <br />previous phase will be reclaimed. This separation of phases will limit the overall disturbed <br />area. Areas will be mined in order. Reclamation of the slopes will occur promptly after the <br />gravel is mined allowing the pit to then fill with water. Area details can be seen below. <br />11/7/2005 Page D-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.