Laserfiche WebLink
<br />• <br />• <br />TABLE 12-2 <br />YOAST MINE <br />ANNUAL COAL PRODUCTION ~ - <br />' 2 Total Tons <br />Yearlsl Coal Acres Dragline HW Miner Totals <br />1995 0 0 0 0 <br />1996 6.08 137,000 0 137,000 <br />1997 41.18 905,400 0 905,400 <br />1998 58.33 892,230 0 892,230 <br />1999 39.62 670,600 0 670,600 <br />2000 61.86 774,540 0 774,540 <br />2001 73.51 1,031,330 0 1,031,330 <br />2002 59.91 1,008,120 0 1,008,120 <br />2003 44.71 863,570 0 863,570 <br />2004 29.0 600,850 530,000 1,130,850 <br />2005 0 0 130,000 130,000 <br />2006 11.1 319,630 0 319,630 <br />2007 7.0 75,000 60,000 135,000 <br />2008 0 0 536,090 536,090 <br />2009 0 0 0 0 <br />2010 0 0 0 0 <br />2011 0 0 0 0 <br />Totals 432.3 7,278,270 1,256,090 8,534,360 <br />Notes: <br />Stripping at Yoast began in October 1996. Data through 2003 are actual production numbers <br />~ Coal acres corresponds with areas in production for dra line coal production only. <br />TR-25 <br />Revised 09!04 <br />