Laserfiche WebLink
<br />APPENDIX C <br />RECLAMATION COSTS <br />Reclamation costs broken down into categories as follows: <br />A. BACKFILLING <br /> I. 300 yards per acre at <br /> II. Equipment to be used: <br /> cat, scraper and tractors <br />B. LEVELING AND GRADING <br /> I. 300 yards/acre at <br /> II. Equipment to be used: <br /> cats, scrapers, draglines, <br /> trucks and tractors <br />C. TOPSOILING <br /> I. 400 yards/acre at <br /> II. Equipment to be used: <br /> cats, loaders and trucks <br />D. RESEEDING <br /> I. 1,420 pounds of seed at <br /> II. Equipment to be used: <br /> drill and tractor <br />E. TREES <br />I. <br />F. GROUND PREPARATION <br />G. MAINTENANCE - 3 years <br />Labor <br />Tools <br />Fertilizer <br />Fencing <br />TOTAL COST OF RECLAMATION: <br />A, B & C = $500.00/acre x 200 acres <br />D = $14.65 x 200 acres <br />E _ $6165.00 total <br />F = $1600.00 total <br />G = $20,000 total <br /> Cost per acre: $653.48 <br />$ .50/yard <br />$ .50/yard <br />$ .50/yard <br />$14.65/acre <br />$6,165.00/total <br />$1,600.00/total <br />$15,000.00/total <br />$ 5,000.00/total <br />(None) <br />(Existing) <br />$100,000.00 <br />2,930.00 <br />6,165.00 <br />1,600.00 <br />20.000.00 <br />