My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-08-16_PERMIT FILE - M2001087
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2001087
>
2001-08-16_PERMIT FILE - M2001087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2021 1:46:09 PM
Creation date
11/25/2007 4:50:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001087
IBM Index Class Name
Permit File
Doc Date
8/16/2001
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMTION PERMIT APPLICATION FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tractor Costs <br /> Capacity 50 hp <br /> Average operating speed 2 mph <br /> Implement width 10 feet <br /> Labor cost per hour $22.00 <br /> Equipment cost per hour $28.00 <br /> Fuel cost per hour $10.00 <br /> Total tractor cost per hour $60.00 <br /> Acres per hour 2.4 <br /> Tractor cost per acre crimped $25.00 <br /> Seeding Fertilizer and Mulching Costs <br /> Seed mix cost per acre estimate $200.00 <br /> Fertilizer cost per acre $85.00 <br /> Straw mulch cost per acre $100.00 <br /> Reclamation Cost Summary <br /> Mobilization cost $500.00 <br /> Bulldozer cost per acre $71.50 @ 20 acres $1430.00 <br /> Front end loader cost per acre $109.00 @ 20 acres $2180.00 <br /> Tractor cost per acre $25.00 @ 20 acres $500.00 <br /> Seed mix, fertilizer,and mulch $395.00 @ 20 acres $7700.00 <br /> Total Reclamation Cost, 20 acres of mined land $12,310.00 <br /> 23.5%administration and OH addition $2892.85 <br /> Total Reclamation Cost Estimate $15,250.00 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.