My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118163
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:51 PM
Creation date
11/25/2007 4:49:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Permit File
Doc Date
4/29/1983
Doc Name
TERRA CONSTRUCTION INC VOLLMER PIT FN 83-35
From
MLRD
To
RINDAHL & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o_ <br />Or <br />f•tr. Gilbert F. Rindalrl -S- ~•larch i?l, 19133 <br />:~ <br /> <br />c' <br />N~ <br />~~ <br />Exhibit J <br />This exhibit has statements strongly recrnnmendiny that the riparian zone <br />< not be disturbed and that drainage into this zone must be controlled. As <br />mentioned above, this is important and has not been adequately covered <br />(especially as concerns sediment control). <br />Exhibit L <br />As +nentioned above, the cateyories of disturuance (major, +noderate, <br />and minor) and the acreages comprising each have not ueen adequately <br />outlined. This +nakes analysis of the costs given difficult. It <br />appears tlrat• the costs only contemplate lU acres of total disturbance <br />at any or+e tine. This appears to be much ton low a fiyure. Please <br />clarify this matter. <br />2. Amore detailed cost break-down should be given for all the necessary <br />reclamation activities, given any new activities to be undertaken as <br />a result of the response to this letter. Ibis cost break-doom <br />should be more closely tied to a cost per acre or cost per activity <br />basis than it is now. Also, son+e of the costs given now seem low. <br />For example, seeding, mulching and crimpiny is given at $30.OU per <br />acre. The total cost indicates, however, that you meant ~3UU.OU per <br />acre. Even this fiyure seems low given prese+it costs. This should <br />, ,be broken down further, including such items as rakiny to cover seed <br />or drilliny. <br />Exhibit M <br />To date, our Uivision has received no proof of operator compliance with <br />El Paso bounty zoning. Please provide this or have the county provide it. <br />Exhibit IJ <br />Will the operator require a fuyitive dust permit for this operation? if <br />su, proof of the per+nit (or application for it) should be provided to Che <br />Uivision. <br />As you know, the Uivision must be provided with proofs of the four <br />sequential weeks of publication and notifications to all adjacent <br />landowners. this must be done before the hoard can consider this <br />application during the scherluled I\pril 27-I_t1, 19133 nieetiny. <br />Ns always, if you have any questions concerning any parts of this letter, <br />please call +ne. <br />S~i"ncerely, <br />Mark S. Loge <br />Senior kecla~nation Specialist <br />MSL/eap <br />Uoc. po. 175`) <br />Tom: • .~~. .-.~v~J ~--~~ r r.. <br />t, ~~-t.f 1`c <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.