• Colorado Division of Minerals and Geolog• <br />ESTIMATING FORM - BULLDOZER YORK <br />Task !: 3 Prep, by: CLK <br />Date: 77/27/% Permit I:M-%-060 <br />Permit Action: Neu Permit <br />Task Description: BeckfiLl aidesl~pes <br />NOIIRLY EDUIPMENT COST <br />Task Fl le Name: M060-3 <br />Mine: Fi restien Pit <br />Basic Machine: Cat DBM NorsepoNer: 285 <br />Blade Type: SEMI-UNIVERSAL -- <br />Attaehrent Y1: ROPS Ceb Shift Basis: 7/day <br />AttachKrent k2: N/A -------- <br />Coat Breakdosn: <br />---------- Utilization X <br />Orercrship cost/hr = (40.05 M/A <br />Operet ing i overhaul cost/hr- dozer = f51.67 700 <br />-ripper = f0.00 N/A <br />Operator cost/hr = (22.95 N/A <br />Total eopt. unit cost/hr = 5774.67 Total fleet cost/hr: (229.33 <br />MATERIAL WANTITIES <br />=zs=zz=::==________ <br />Initial Srell Loose <br />Volume: 75,625.0 CCY Factor: 1.125 Volure: 77,578.7 LCY <br />Source of quantity take-off: Exhibit L <br />-------------------------------------- <br />Souree of est. snail factor: Cet Handbook <br />HOURLY PROWCTION <br />_______________ Job Condition Correction Factors <br />Avg. push distance: 150 ft. ---------------- ------- <br />__ ___~ Operator.......... 0.75 (avg.) <br />Unadjusted hourly Met. consistency.. 7.00 (Cat tbt) <br />dozer production: 597 LCY/hr Dozing method..... 7.00 (pen.) <br /> Visibility........ 7.00 (avg.) <br />Materiel carei stercy: Job efficiency.... 0.83 (7sh/day) <br />Consolidated stockpile Spoil pile factor. 0.90 (ssd-fe) <br />_______________________ ______________ Push 9redient..... 7.78 (Cat tbl) <br />Avg. push gradient: 8.00 X (nag) Altitude deratian. 1.00 (Cat tbl) <br />--- ----- Materiel yeight... 1.00 (Cat tbl) <br />Avg. site altitude: 5000 ft. Blade type........ 1.00 (S,SU,U) <br />Materiel Height 2300.00 lb/LCY Net Job Correction 0.66 <br />Met. Descr.: --- ------ -- --------- <br />GENERAL FILL Adjusted Unit Prad.: 397.79 LCT/hr <br /> Adjus ted Fleet Production: 782.37 LCY/hr <br />JOB COST -- -- <br />Fleet size 2 Dozers) <br />Unit Lost (0.293 /LCY <br /> <br />Total Job Time: 22.47 Hours <br />Total Job Cost: f5, 152.54 <br />• <br />