My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118112
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:13:49 PM
Creation date
11/25/2007 4:45:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996060
IBM Index Class Name
Permit File
Doc Date
11/21/1996
Doc Name
ESTIMATING FORM SCRAPER WORK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRmUCT10N: <br />___ _____________ ~ Jab Cordition Correction Factors <br />Scraper Cycle Tice ~ ---------------- <br />------ ~ Site altitude = 5000 ft. <br />Lod 1 min. ~ --------- <br />------- ~ Alt. djustment .. 7 <br />Meretner i spred = 0.6 min. ~ Job e/f iciency ... 0.83 (7sh/d) <br />Travel time (haul d return): ~ Met Correction 0.83 <br />Haul route-----~~ - <br />Rod Lerpth Grade Rolling Total Velocity Travel times <br />eeg. M (f t) res.(X) res.(X) rea.(X) (fpm) (min) <br />1 500 -7.00 3.00 2.00 2640 0.39 <br />xaul time = 0.39 min. <br />Return route ----------- <br />1 500 7.00 3.00 4.00 2933 0.36 <br />•tst i last seg. dj. for eccel. /decal. Return tine = <br />Total Cycle Time = 2.34 min. <br />------- ~ Machire Volume <br />Machine Peylod ~ -------------- <br />------------- ~ Struck capacity = <br />Materiel rei ght = 2700.00 lbs/LCY ~ Heepd tepetity = <br />Mat. descri ptian <br />Sard i clay - Lapse ~ Average = <br />Retd paylod....= 75,000 lbs. ~ Adj vstd volume = <br />------- <br />Peylod volume...= 27.78 LCY <br />Unadj ustd praalucti on per scraper or push-pull pair <br />Adj ustd production .................................: <br />Adjustcd hourly fleet production ....................: <br />JOB COST: <br />= Fleet Si ie i SC roper(s) Total Job Time: <br />Unit Cost f0.396 /LCY Total Jab Cost: <br />0.36 min. <br />21.00 <br />37.00 <br />26.00 LCY <br />26.00 LCY <br />666.33 LCY/hr <br />553.05 LCY/hr <br />553.05 LCY/hr <br />6.67 Hours <br />57,462 <br />• • <br />
The URL can be used to link to this page
Your browser does not support the video tag.