Laserfiche WebLink
<br />Exhibit x <br />3eclamation Cost <br />The quarry operation is in an existing quarry site where <br />the surface had been previously uncovered. The disturbance <br />of surface ground will be minimal. Stone removed on an <br />annual basis ~•rould be 3000 to 5000 tons. Stockpiled rubble <br />and sand would be used to recover grid regrade the area to <br />match adjoin,ina a.~oas. This will be done using our orm <br />equipment. Estimated cost to reclaim tre area ;ou].d be <br />~~190.00 per acre for a total cost of .j, 1000.00 or less. <br />