Laserfiche WebLink
• iii iiiiiiiiiiiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />171 3 Sherman 51., Room '? I S <br />Denver, Colorado 80203 <br />Phone: 0031 8663567 <br />FAx. (3031 832-8106 <br />March 1. 1994 <br />Mr. Ray Miller <br />Baca County <br />741 Main Street <br />Springfield, CO <br />Commissioner <br />- P.O. Box 116 <br />81073 <br />I~~~~ <br />DEPARTMENT OI <br />NATURAL <br />RESOURCE` <br />Rny Romer <br />Gwerno~ <br />ken Salo ar <br />Etruiimr Duel iw <br />Michael8 Lunti <br />Diva mn Duey nr <br />Re: M-93-087, Weeden Pit #30, Permit Issuance <br />Dear Mr. Miller: <br />On February 24, 1994, the Division of Minerals and Geology found Baca County <br />to have satisfied the applicab]e requirements of C.R.S. 34-32-101 et she for <br />obtaining a mining and reclamation permit. Therefore, a permit is being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, February 24, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$225.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />\S\i n c e rer\\`y- `\\~ <br />MICHAEL B. LONG <br />Division Director <br />MBL/RCO/ern <br />Enclosure 8143G <br />